f April II, 1979 MEMORANDUM FOR:
Robert C. Arnold GPU Operations Manager FROM:
Roger J. Mattsco, Director, 055 5UBJECT:
ACCEPTA8111 TY OF $YSTEM CRITERIA FOR USE OF STEAM GENERATORS FOR SHORT AND LONG TERM C001.00VN The NRC Technical Review Croup has reviewed the system criteria for use of the steam generators in a water solid condition for short and long tern cooldown (Rev.
I, 1-10-79) 4 as presented by GPUSC.
(Hemo f rom C.
R. Capodanno to W.
R. Cobean 4/10/79 # 1900 hrs).
This docu., ant i nc. l ude s enod i f i ca t i ons proposed by the group as a result of AprII 9th and 10t h anee t i ngs.
We find the design criteria acceptabig documented pending inclus ion and review of et cer.rical as criteria, with one exception.
That is the design flow rate of 3000 ppm for the A and B modifications doas not reflect design margin compared to the minimum flow requiree nts recocinended by B&W in its presentation to Hated on AprII 11 This point needs early resolution.
Final design and any additional substantive changes to the criteria should be transrsitted to us fo r cormwsn t s.
C[
Roger J. Mattson. Directo, Division of Systems Safety cc: