Forwards IE Insp Rept 50-320/77-01 on 770110-11.No Noncompliance Noted
ML19220B812
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/04/1977
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
Shared Package
ML19220B813 List:
References
TASK-TF, TASK-TMR NUDOCS 7904270400
Download: ML19220B812 (2)


See also: IR 05000320/1977001

Text

-

-

' .

-

-

.

.

g ** " '%g

tnM Al

b)G

UNITED STATES

~

.,4

4

NUCLEAR R EGULATOR Y cOMM!sstON

,

f

REGION I

.N

1"

.f

$31 P AR K AVENUC

. * ,

% , ,~.....$

KING OF PRUSSI A. PENNSYLV ANI A 19406

Docket No. 50-320

EE.3 4

I977

Metropolitan Edison Company

ATTN:

Mr. R. C. Arnold

Vice President

.

P. O. Box 542

Reading, Pennsylvania 19603

.

Centlemen:

Subject:

IE Inspection Report No. 50-320/77-01

This refers to the inspection conducted by Mr. T. Rebelowski of this

office.on January 10-11, 1977

at Three Mile Island Nuclear Station, Unit

2 of activities authorized by NRC License No. CPPR-66 and to the d

of our findings held by Mr. Rebelowski with Messrs. R. Toole and M.

s

Nelson of your staff at the conclusion of the inspection.

Areas examined during this inspection are describ

letter.

(

Within these areas, th. inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

,

Within the scope of this inspection, no items of noncompliance were

_

observed.

In accordance with Section 2.79f of the NRC's " Rules of-Pract

2. Title 10, Code of Federal Re ,. 'ations, a copy of this letter and the

. Part

enclosed inspection report util oe placed in the NF,'s Public Document

Room.

If this report contains any information that yo':

believe to be proprietary, it is necessary that you rnke a written (oryourcont

application within 20 days to this office to withholJ such information

from public disclosure. Any such application must t? accompanied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered by the Commissicn as listed in subparagraph (b)(4) of Section

2.790.

far as passible into a separate part of the affidavit.The informa

will be placed in the Public Document Room. hear from you in t

If we do not

.

.

wm

G

f

-

_.

__

_,

.

.

_

_

.

Metropolitan Edison Company

2

FEB 4

1977

~

No reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

.i

G

^ N

E!donJ.Brunner, Chief

Reactor Operations and Nuclear

dupport Branch

Enclosure:

IE Inspection Report No. 50-320/77-01

cc: w/ encl

R. L Wayne, OA Manager, Design & Constructior

T. M. Crimins, Jr., Safety & Licensing Manager

R. W. Heward, Jr., Project Manager

W. A. Verrochi

Vice President, Design & Construction

Gerald Charnoff, Esquire

Miss Mary V. Southard, Chairman, Citizens for a Safe Environment

(

(WithoutReport)

i

a

L

82 252

..

-.

y