ML19220B653

From kanterella
Jump to navigation Jump to search
Notes Candidates A,B,C & D Nominated in Util Are Qualified as Shift Foremen,But Candidate E Needs More Experience
ML19220B653
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/01/1972
From: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
To: John Wise
METROPOLITAN EDISON CO.
References
NUDOCS 7904270175
Download: ML19220B653 (2)


Text

-

w cFi 92 CRVan Niel:ci L:0SS 12/1/72 Metropolitan Eciscn Ccmpany ATTN:

Mr. Jchn L. Wise, Superintendent Three tiile Islana Nuclear Generating Staticn P.O. Box 542 Reading, Pennsylvania 19603 Gentlemen:

Reference your letter to the AEC datec Cctober 16, 1972, regarding the prcmotion of five Auxiliary Operators assigned to Unit 1 to the position of Shift Foremen for Unit 2.

We have reviewed.the resumes you have provided and have made the following determination as to their qualifications in comparison with the guidance provided in ANSI Ni3.1-1971,

" Selection and Training of Nuclear Pcwer Plant Personnel."

Candidates A, B, C, and D are acceptable for Shift Foremen. They should continue their participation in the Unit i preoperational test and startup program, and attend the BaW simulator training program you proposed in your letter. The resume submitted for Candidate E incicated that he lacks the requisite power plant experience to qualify as a Shift Fo reman. We suggest that he complete the training proposed in Mr. Collins letter to you dated November 14, 1972 and then gain operating experience as a licensed ' operator. At some future date he again could be considered for the position of Shift Foreman.

7904270115' 81 0G1 i

2-

.J. L. Wise If we can be of any assistarice, please let us kncw.

Sincerely, R. C. CeVoung, Assistant Director for Power Water Reacters Directorate of Licensing

@f m

=

81 062

_