Text
.
n
~
CA;7;o L t4.45
J ""
4
UNITED STATES
_t
NUCLEAR REGULATORY COMMisslON
,,
i
,3
REGION I
,
.2icaux avenut
.
,g
g
xi~a or caussia. renusvuvania i,.os
,% ggj
....."
Docket No. 50-320
Metropolitan Edison Company
ATTH: Mr. R. C. Arncld
Vice President
P. O. Box 542
Reading, Pennsylvania 19603
Gentlemen:
Subject: Inspection. 50-320/77-10
This refers to the inspection conducted by Mr. A. Fasano of this office
on March 14-18, 1977 of activities authorized by NRC License No. CPPR-66
and to the discussions of our findings held by Messrs. Fasano and Rebelowski
of this office with Messrs. Miller and Toole of your staff at the conclusion
of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and' reprasentative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
obs erved. .
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part
~
2 Title 10 Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room. If this report contains any infomation that you (or your con--
tractor) believe to be proprietary, it is necessary that you make a
.
written application within 20 days to this office to withhold such
infonnation from public disclosure. Any such application must be acespanied
b'y an affidavit executed by the owner of the information, which idencifies
the document or part sought to be withheld, and which contains a statanent
of reasons which addresses with specificity the items which will ba
.
_
i
~
7904s701k!
~
L
81 005
cw M
-
- -
.
.
g
-
.
-
-
Metropolitan Edison Company
2
APR 121977
.
considered by the Commission as a
ad in subparagraph (b)(4) of Section
2.790. The information sought te De withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the report
will be placed iri the Public Document Room.
-
,
No reply to this letter is required; however, if you should have any
questions concerning this inspection, we will be pleased to discuss them
with you.
Si nc e~ rely,
l
'
,
.
s
El
n
. Brunner, Chief
i
Re/, ctor Operations and Nuclear
56pport Branch
I
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-320/77-10
i
cc w/ encl:
J. G. Herbein, Manager', Generation Operations - Nuclear
R. L. Wayne, QA Manager, Design & Construction
T. M. Crimmins, Jr., Safety &' Licensing Manager
R. W. Heward, Jr., Project Manager
W. A. Verrochi, Vice President. Design & Construction
G. Miller, Unit 2 Superintendent
Gerald Charnoff, Esquire
Miss Mary V. Southard, Chairman, Citizens for a
Safe Environment (Without Report)
.
L.
81 006
.
~