ML19220B629

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-320/77-12 on 770328-31.No Noncompliance Noted
ML19220B629
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/05/1977
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
Shared Package
ML19220B630 List:
References
NUDOCS 7904270143
Download: ML19220B629 (2)


See also: IR 05000320/1977012

Text

c3.,

.

ei

.

~

-

"

t.

UNITED ST ATES

NUCLEAR REGULATORY COMMisstON

,

, *"o

REGION I

,

,

'l

$ 31 P A R K AVENUE

V'

i

f

KING O F PR U$51 . PENN5YLV ANR A

19406

", r

3. f*

j

g

s.,

f

MAY 5

1977

  • ~~

Docket No. 50-320

Metropolitan Edison Company

ATTN: Mr. R. C. Arnold

Vice President

P.O. Box 542

Reading, Pennsylvania 19603

Genticcen:

Subject: Inspection 50-320/77-12

This refers to the inspection conducted by Mr. T. Rebelowski o

office on March 28-31, 1977,

2, Middletown, Pennsylvania, of activitics authorized by HRC Licen

CPPR-66 and to the discussions of our findings held by Mr. Rebelow

i

f the

with Mr. Toole and other members of your staff at the conclus on o

.

inspection.

Areas examined during this inspection are desc

Within these areas, the inspection consisted of selective,ih

examinations of procedures and , representative records, interviews w

l etter.

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncomp1*ance were

observed.

In accordance with Section 2.790 of the NRC's

t

enclosed inspection report will be placed in the NRC's Public Documen

If this report contains any infomation that you (or your con-

written application within 20 days to this office to

Room.

Any such application must be

infomation from public disclosure.

accompanied by an affidavit executed by the owner of the informa

hich

which identifies the document or part sought to be withheld, and w

con % ins a statement of reasons which addresses with specificity t

items which will b= cansidered by the Commission as listed in subp

The information sought to be withheld

a 2.790.

graph (b)(4) of

as far as possible into a separate part of the

shall be incor;

not hear from you in this regard within the spec-

y

ified period, the .: port will be p'. aced in the Public Document Room.

affidavit. If w.

'

.

7 9 0 4 2 7 01^l3

80-341

L

I

p m9

(/.

-

-h*

-.

.

-

_

_

.

.

. -

.

.

_

.

.

hh4Y5

1977

Metropolitan Edi. 1 Company

2

_

.

No reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss them

with you.

.

Sincerely ,

,

/

.

a

E

n'$. Brunner, Chief

Redctor Operations and Nuclear

$uppcrt Branch

Enclosure: Office of Inspection and Enforcement Inspection Report

Number 50-320/77-12

cc w/ encl:

R. L. Wayne, QA Manager, Ocsign & Construction

T. M. Crimmins, Jr., Safety & Licensing Manager

R. W. Heward, Jr., Project Manager

W. A. Verrochi, Vice President, Design & Construction

J. G. Herbein, Manager, Generation Operations - Nuclear

G. Miller, Unit 2 Superintendent

'

Gerald Charnoff, Esquire

Mi.ts Mary V. Southard, Chairman, Citizens for a Safe Environment

(Without Report)

(

!

80 242

.

_.

e

.

o