ML19220B550

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-320/75-07 on 750610-13.Noncompliance Noted: Welding of safety-related Piping & Control of Filter Metal Did Not Meet Required Specs
ML19220B550
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/23/1975
From: Durr J, Heishmon R, Narrow L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19220B535 List:
References
50-320-75-07, 50-320-75-7, NUDOCS 7904270017
Download: ML19220B550 (13)


See also: IR 05000320/1975007

Text

.

IF:1 Tom 12

(Jan 75) (Rev)

.

U. S. NUCLEAR REGULATORY CC:0!ISSIO!;

OFFICE OF INSPECTION AND ENFORCDIErr

.

REGIO:i I

IE Inspec tion Report No:

50-320/75-07

_

Docket No:

50-320

Licensec:

Metropolitan Edisen Company

License No:

CPPR-66

_

Box 542

Priority:

--

Reading, Pennsylvania

19603

Category:

A

l

Safeguards

Location:

Middletown, Pennsylvania (Ti. e Mile Island 2)

"E

-

_

f

Type of Licensee:

PWR 871 m'e ('

,

T-

or Inspec tion:

Routine - Unannounced

Dates of Inspection: _

June 10-13, 1975

Dates of Frevious Inspection: _ May 12-13, 1975

__

Ecporting Inspector: ,

A

II

L. Narrow, Reactor Inspector

'

BATE

-

panying Inspectors:

MM//

// h A._/

J. P/ Durr, Reactor Inspector

b d VM(

_

DATE

'

DATE

_.

DATE

Other Accompanying Personnel:

NONE

_

_

.,

,

DATE

Reviewed By:

/

,

[

1A

[.F.HeiMn,Seni

[f

[

Re

r Inspector

/

DidE

,

-

l

.

-

eo-Or3

7 9 0 4 2 7 0 Or{

.

'

S1'MM.iRY OF FINDI!;CS

Enf orcer.cnt Action

A.

Itecs of Monccenliance

1.

Infractions

Contrary to 10 CFR 50, Appendix 3, Criterien IX:

Welding of safety related piping was not in accordance

a.

with Specification No. 2555-72 in'that the welder made

nu=erous are starts and stops without grinding.

,

i

b.

Control of filler cetal was not

sceordance with

Specification 2555-72 in that the selder was observed

_

to have more than one type of filler =etal in his

possession while working on safety-related piping.

(Details, Paragraph 3)

t

2.

Deficiencies

Contrary to 10 CFR 50, Appendix B, Criterion V:

Docu=entation for the ore flooding tanks was approved by QA

as teeting the requirements of Enginering and Manufacturing

Instructions (IEMI) 6M02 and was released for construction

although the documentation furnished did not provide evidence

of charpy tests as required by 6M02.

(Details Paragraph 2)

_

B.

Deviations

Mone

Licensee Action on Previous 1v Identified Enforcement Matters

The following yreviously identified items of noncompliance have

-

A.

been resolved:

1.

Intdequate drawing control.

(Details, Paragraph 4)

_

e

1

~

.

-

_2_

2.

Inco=plete records of welding caterial release.

(Details,

Paragraph 5)

Desien Changes

1;one

Unusual Occurrences

1;ene

Other Significant Findings

A.

Current Findines

1.

The follcuing itecs are considered to be acceptable:

.

The licensce's, A-E's and Constructor's manuals and pro-

a.

cedures.concerning velding.

(Details, Paragraph 6)

b.

Babcock and Wilcox (B5W) field velding practices, pipe

f abrication shop and velding material storage and issue

I

facilities and practices.

(Details, Paragraph 7)

United Engineers & Constructors velder qualification

c.

program, and welding material storage and issue facili-

ties and practices.

(Details, ?aragraph 8)

.

3.

Status of Previousiv Reported Unresolved Items

1.

The following items have been resolved:

.

a.

Containment doce liner flatness.

(Details, Paragraph 10)

b.

Reinstruction of Stressteel Company personnel in requira-

ments of field installation procedure.

(Details, Para-

graph 9)

2.

The following item was reviewed but re=ains unresolved:

a.

Tendon grouting voids.

(Details, Paragraph 11)

_

Q(}--A rr)

{ L.

s.

-

c. e ~,

_

1

.-

_

M

- 3-

Exit Interview

An exit interview was held at the site on June 13, 1975 with the

following attendees:

General Public Utilities Service Corneration

R. F. Fenti, Quality Assurance Auditor

W. T. Gunn, Site Manager

.i . Levin , P r oj e ct Engin ee r

3. L. Roshy, Quality Assurance Engineer

M. J. Stronberg, 3ite Quality Assurance Auditor

J. E. Wright, Resident Civil Engineer

United Encineers and Ccnstructors

,

V. E. Cichoki, Coordinating Superintendent, QA/QC

C. W. Hunttr, Electrical Supervisor

D. C. lanbe rt , Field Supervisor, Quality Control

D. E . S=ith, Welding Superintendent

J. C- Spinak, QA Engineer

Burns & Roe

G. T. Harper, Jr. , Site Project Engineer

Babcock and Wilcox

R. J. Kun , Quality Control Supervisor

B. E. Treadway, Project Manager

The itens discussed are sirrmarized below.

_

acknculedged the information.

In each case the licensee

A.

Scoce of the Inspection

The inspector stated that this was an unannounced . inspection to

reviaw the QC program for pis ing and the status of previously

identified findings.

B.

Itens af Noncompliance

The inspector stated that two itens of ncncompliance had been

_

identified.

~

i

l

k

g P--y ('.1

-

.

_

-S-

2.

The inspector stated that regrouting to fill the voids which

had developed following grouting of the vertical tendcas was

corsidered to be acceptabic. However, this item re=ains un-

resolved until final grouting procedure has been developed.

(Details, Paragraph 11)

.

e

ao

e

Or a r z.>,

.

.u

_

W

-

DETAILS _

Persons contacte_d

l.

General Public Utilities Service Cornoration

__

R. F. Fenti, Quality Assurance Auditor

W. T. Gunn, Site Manager

S. Levin, Project Engineer

D. Perry, QA Engineer

G. L. Roshy, Quality Assurance Engineer

M. J. Strc= berg, Site Quality Assurance Auditor

J. E. Wright, Quality Assurance Manager

Resident Civil Engineer

J. H. Wright,

United Encineers and Constructors

_

J. Carrabba, Field Construction /QC Supervisor

A. Carrera, Assistant Field Construction /QC Supervisor

QA/QC

V. E. Cichocki, Coordinator Superintendent,

L. Dick, QC Engineer

P. Hunter, Electrical Supervisor

F. Kovalik, Office Engineer

Field Supervisor, QC

D. C. La=bert,

F. F. Long, Assistant Field Supervisor, QC

D. Smith, Welding Superintendent

W. Tinlin, Structural Engineer

R. Udorich, riping Engineer

Babcock and Wilcox

.

G. Brotton, QC Technician

J. Jeffers, QC Technician

R. Kunz, QC Supervisor

D. Montcasle, Welding Technician

M. Shultz, Construction Supervisor, Pipe Shop

F. Skrzypice, Field Engineer

R. E. Treadway, Project Manager

Core Flooding Tanks

2.

The inspector examined the following documents:

_

=

_

S

a-_.

_

4

.

-7-

Procedure QC 2-2 which requires that the QA group will review

a.

documentation for completeness, accuracy and cocpliance with

applicable specifications and that this review will be ccc-

to construction.

pleted prior to release of equipment

Engineering and 15nuf acturing Instruction

Interdepartzent

b.

(IEMI) 6M02 f or f abrication of the core flooding tcnks.

The documentation package for those tanks including Attach-

c.

cent A of QC 2-2 stating that the documentation package had

been reviewed and accepted by QA as teeting the require ents

'

of 6M32 and the tanks were released to construction.

The inspector observed that although IEMI 6M02 requires that

'

charpy tests be performed, records were not available to

confirm such tests for all of the material used in fabrication

-

of the tanks.

The material had been furnished by Lukens Steel

Company from Heat Mos. which were identified in the package.

However, documentation was not available to confirm performance

of charpy tests on soce of the caterial.

(Reat Nos. C5749-61

and 62, C5790-69 and C6588-72).

This is censidered to be a deficiency with respect to 10 CFR 50, Appendix B, Criterion V which states, in part, " Activities

'

affecting quality shall be prescribed by docu=ented instruc-

l

tions, procedures, or drawings, of a type appropriate to the

circu= stances and shall be acco=plished in accordance with

these instructions, procedures, or drawings."

,

!

3.

UELC Field Welding

The inspectot observed field welding of the following joints:

-

l

No. DH-V107B (10 inch) on the decay Ecat Removal System.

a.

.

I

b.

Nos.143-A5 and 148-Al (1 inch) on the Makeup and Purifica-

tion System.

,

No.148A-1 (1 inch) on the Makeup and Purification System.

c.

g

The inspector found that the filler metal container of the welder

working on Item b above contained both bare filler metal, 308L

-

stainless steel and E7018 covered electrodes.

.

-

.

k

'

g -..

-

.. .

e

-B-

The inspector also observed that the welder working on item c above

made numerous " stops and starts" of the arc without grinding.

The

inspecter questioned the welder concerning the grinding require-

ments for this type of joint and was informed that grinding is not

norcally required f or socket veld joints

These actions are contrary to . . ' Specification 2555-72 Division

13, Section 13A. Paragraph 3.1.2.8 of this specification states,

in part, "Only one type of filler metal shall be issued to a welder

any one time and any previously issued but not used, shall be

atreturned f or bake-out or disposal".

And Paragraph 3.1.2.3 states,

" Arc strikes, starts and stops shall be recoved by grinding.

This is considered to be an infraction with respect to 10 CFR 50,

Appendix B, Criterion II which states, " Measures shall be estab-

lished to assure that special processes, including welding, heat

treating, and nondestructive testing, are controlled and acce=p-

-

lished by qualified personnel using qualified procedures in accord-

ance with applicable codes, standards, specifications. criteria,

and other special requirements."

4.

Drawing Control

.

Inadequate control of drawings in the field had previously been

identified as a noncompliance (Inspection Reports No. 50-320/74-04

and 74-09) .

The inspector reviewed the following:

UELC Procedure CCP l-2 " Drawing Specification and Document

a.

Control" dated April 22, 1975.

i

b.

Internal Memorandum dated April 21, 1975 which established a

~

require =ent for indoctrination of personnel in GCP 1-2.

,

GPU Service Corporation Audit Reports No. 75-01, 75-16 and

c.

75-20.

.

E

The inspector cbserved that CCP-12 required indoctrination and

training of personnel and frequent audits of drawings and other

docu=ents by each of the departments which receive and distribute

,

docu=ents.

The required indoctrination had been conducted and

'

!

-

.

$

~

i (_

4

r

k

.

4

_9-

the audits perforr.ed.

The GPU Service Corporation audits revealed

a decreasing number of deficiencies since early 1975.

Audit so.

75-20 identified only cinor discrepancies all of which were

corrected prior to co=pletion of the audit.

The site QA Auditor

stated that additicnal audits would be conducted in June and July,

1975 to observe that i= proved control of drawings was caintained.

The inspector examined the files and drawings maintained in the

UE&C Engineering Of fice and the piping and structural departtents,

spot checked the audits of the structural department and drawings

in the office of one of the piping forecen.

This item is resolved.

5.

Weldine Material Control

Failure to record the time of weld rod issue on requisition forms

'

had been identified as a nonce =pliance.

(Inspection Report 50-320/

75-03).

The inspector reviewed the appropriate velding caterial

control require =ents for B&W and UE&C.

The inspector reviewed several welding caterial issue slips and

observed that the date and time of issue of weld rod was recorded.

This item is resolved.

6.

Document Review

The inspector reviewed the following docu=ents in the areas speci-

fically related to velding of safety related piping.

Metropolitan Edison Company Quality Assurance Plan Design

.

a.

and Construction Three Mile Island, Unit #2 Revision No. 10.

b.

Burns and Roe (B&R) Specification 2555-72, Piping and Mechanical

Equipment Installation, February 14, 1975.

B&W Construction Co=pany Quality Control Manual.

c.

.

d.

UE&C Mechanical Construction Procedures and Quality Control

Procedures.

This item is considered to be ceceptable.

_

.

e gr

n

l_

l

-

.

O

.

-10-

BLW Weldine Facilities and Practices

7.

Field Weldine

a.

The inspector observed the perf ormance of field velding on

b

Wl-16

the "incore Monitoring Piping" on veld joints nu= er

prepara-

The inspector observed the veld joint

The

and Ul-21.

tacking and f usion of the insert.

inspector examined the " Weld Lnstruction - Muclear" docuten-

tion, alignment,

l with regard

tation and interviewed welding and QC personne

and authority,

to their dutie.

=

P_ioe Fabrication Shop

b.

ion shop for storage

The inspector examined the pipe fabri-

astruction - Nuclear"

i

and handling practices f or pipe, "We*

documents, and welding practices.

_

Veldine Material Storace and Issue

c.

The inspector examined the bulk storage areas and field issue

Storage and issue of =aterial

points f or velding materials.was f ound to be in conf ormance w

i

d

the B&W Procedures.

These items are considered to be acceptable.

UELC Veldine Facilities and Practices

8.

_

Velder Qualification Program

a.

The inspector reviewed the UE&C velder qualification program

identifi-

_

in the areas of velder qualification dc:umentation,

cation of expired qualifications, and veld joint perfor=ance

identification.

Weldine Material Storace and Issue

b.

The inspector examined the bulk storage areas and field issue

Storage and issue of material

points f or velding material.-was found to be in conformance

d

UELC Procedures.

These itees are considered to be acceptable.

_

i

-.

0(1--a r c,

(

.t

-

E

'

l

_

.

-11-

9.

Installation of Tendon k'ednes

install-

The disposition of a nonconf or=ance resulting from incorrcet

ation of a split cone tendon wedge had been identified in a previous

No. 75-05) as requiring reinstruction

ins ection (Inspection Report

of stressteel Construction and QC personnel in the requirements of

the Stressteel Field Manual.

(NCR) No. 2

The inspector examined Stressteel Moncenformance Report

which had identified this proble= and which showed the disposition

cc pleted on April 23, 1975 with instructions of stressteel ceployees

in requirements of the field =anual.

This item is resolved.

I

t

7

10.

Containment Done Liner Flatness _

area in the containment deme liner had been identified pre-

_

A flat

viously and had been accepted contingent upon modification of the

Reactor Building concrete by the addition of reinforced concrete

(Inspection

stif fener hoops to the spherical section of the dome.

Reports No. 50-322/74-01 and 74-03).

The inspector examined sections of Civil Construction Procedure

(CCP) 3-2 app'2 icable to installation of the concrete stif f ener

rings and QC records for ':encrete placements RB-399 and R3-404.

Records examined included scandard inspection forms and the

CCP 3-2 checklist f or each placement.

This item is resolved.

11.

Tendon Grouting Voids

The development of voids in the top of grouted vertical tendons

had been identified as an unresolved item.

(inspection Report

50-322/75-6).

4 and 6 reporting

The incpector examined Stressteel NCR's Nos.

incomplete filling of the grout cap; the " Procedure for Regrouting

~

Top Anchorages of Vertical Tendons" dated May 9, 1975; Stressteel

29, 1975 reporting the

Supplemental Inspection Report #1 dated May

(DR) No. 0459

results of the regrouting; and UELC Leviation Report

DR No. 0459 authorized regrouting of

and Supplements 1 through 4.

the six vertical tendons which had been reported on NCR's 4 and 6

_

in accordance with the above referenced procedure and accepted the

results of the regrouting.

SI[Id.b

(

i.

_

.

_

.

-12-

Exploratory work is continuing toward development of changes to

the grouting procedure which will correct this problem.

This ite= recains unresolved.

,