ML19220B363
| ML19220B363 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 01/13/1978 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Herbein J METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19220B366 | List: |
| References | |
| NUDOCS 7904250673 | |
| Download: ML19220B363 (2) | |
See also: IR 05000320/1978005
Text
.
.
-
CANTML FILf5
/*H%
UNITED STATES
NUCLEAR R EGULATO RY CUMMisslON
,,
((/[ $
REGION I
s31 PARK AVENUE
3 4' '.']}
', y
O *A
KING OF PRUS$1 A. PENNSYLV ANI A 19406
% . . . . . .,
-
JAN 131973
Docket No. 50-320p3 -3
Metropolitan Edison Company
ATTN:
Mr. J. G. Herbein
Vice President
P. O. Box 542
Reading, Pennsylvania 19603
Gentlemen:
Subject:
Inspection 50-320/78-05
This refers to the inspection conducted by Mr. J. Higgir.s of this office
on January 1-3, 1978, at Three Mile Island Nuclear Station, Middletown,
Pennsylvania, of activities authorized by NRC License No. CPPR-66 and to
the discussions of our findings held by Mr. Higgins with Mr. M. Nelson
of your staff at the conclusion of the inspection.
Areas examined during this inspection included: the Containment Inte-
grated Leak Rate Test, previously identified items and independent
calculations by the inspection. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room.
If this report contains any infonnation that you (or your contractor)
believe to be proprietary, it is necessary that you make a written
application within 20 days to this office to withhold such infomation
from public disclosure. Any such application must be accomptnied by an
affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement
of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b)(4) of Section
2.790. The infomation sought to be withheld shall be incorporated as
far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the eport
will be placed in the Public Document Room.
i
f'
o o n s a a 3 y
? Ti
<
.
.
.
-
' 3 " 7 3 4, ,q
Metropolitan Edison Company
2
No reply to this letter is required; however, if you should have any
questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
/
. - . =
~
'
E don / Brunner, Chief
Reactor Operations and Nuclear
Support Branch
Enclosure: Office of Inspection and Enforcement Inspection
i
Report Number 50-320/78-05
cc w/ encl:
R. L. Wayne, QA Manager, Design & Construction
T. Broughton, Safety & Licensing Manager
R. W. Heward, Jr., Project Manager
R. C. Arnold, Vice President, Generation
L. L. Lawyer, Manager, Ge.leration Operations - Nuclear
G. P. Miller, Superintendent
J. L. Seelinger, Unit 2 Superintendent
Gerald Charnoff, Esquire
Miss Mary V. Southard, Chairman, Citizens for a Safe Environment
(WithoutReport)
l
l
i
!
!
!
' b' 247
<