ML19220B363

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-320/78-05 on 780101-03. No Noncompliance Noted
ML19220B363
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/13/1978
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19220B366 List:
References
NUDOCS 7904250673
Download: ML19220B363 (2)


See also: IR 05000320/1978005

Text

.

.

-

CANTML FILf5

/*H%

UNITED STATES

NUCLEAR R EGULATO RY CUMMisslON

,,

((/[ $

REGION I

s31 PARK AVENUE

3 4' '.']}

', y

O *A

KING OF PRUS$1 A. PENNSYLV ANI A 19406

% . . . . . .,

-

JAN 131973

Docket No. 50-320p3 -3

Metropolitan Edison Company

ATTN:

Mr. J. G. Herbein

Vice President

P. O. Box 542

Reading, Pennsylvania 19603

Gentlemen:

Subject:

Inspection 50-320/78-05

This refers to the inspection conducted by Mr. J. Higgir.s of this office

on January 1-3, 1978, at Three Mile Island Nuclear Station, Middletown,

Pennsylvania, of activities authorized by NRC License No. CPPR-66 and to

the discussions of our findings held by Mr. Higgins with Mr. M. Nelson

of your staff at the conclusion of the inspection.

Areas examined during this inspection included: the Containment Inte-

grated Leak Rate Test, previously identified items and independent

calculations by the inspection. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any infonnation that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such infomation

from public disclosure. Any such application must be accomptnied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b)(4) of Section

2.790. The infomation sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the eport

will be placed in the Public Document Room.

i

f'

o o n s a a 3 y

? Ti

<

.

.

.

-

' 3 " 7 3 4, ,q

Metropolitan Edison Company

2

No reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

/

. - . =

~

'

E don / Brunner, Chief

Reactor Operations and Nuclear

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection

i

Report Number 50-320/78-05

cc w/ encl:

R. L. Wayne, QA Manager, Design & Construction

T. Broughton, Safety & Licensing Manager

R. W. Heward, Jr., Project Manager

R. C. Arnold, Vice President, Generation

L. L. Lawyer, Manager, Ge.leration Operations - Nuclear

G. P. Miller, Superintendent

J. L. Seelinger, Unit 2 Superintendent

Gerald Charnoff, Esquire

Miss Mary V. Southard, Chairman, Citizens for a Safe Environment

(WithoutReport)