Forwards IE Insp Rept 50-320/78-04 on 780105-06 & 26-27.No Noncompliance Noted
ML19220B360
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/17/1978
From: Nelson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19220B361 List:
References
NUDOCS 7904250670
Download: ML19220B360 (2)


See also: IR 05000320/1978004

Text

'

.

C Ed TgM ALE.1

UNITED ST ATES

pa macut

NUCLEAR REGULATORY COMMisslON

i p s -( ;.,,#9,

aEcron i

'

E31 P ARK AVENUC

19406

,

5.,t -

  1. f

j

KING OF PRUS$1 A. PENNSY LV ANI A

o,-y d %**f' g

f

FEB i7 !m

u-

.....

,

l

t

Docket No. 50-320

Metropolitan Edison Company

ATTN: Mr. J. G. Herbein

Vice President

P. O. Box 542

Reading, Pennsylvania

19603

Gentlemen:

I

Subject:

Inspection 50-320/78-04

This refers to the inspection conducted by Mr. K. Plumlee of this

on January 5-6, and 26-27,1978,

ating Station, Unit 2, of activities authorized by NRC License No. CP

66, and to the discussions of our findings held by Mr. Plumlee with Mr

G. Miller and other members of your staff at the co

15, 1978.

and Mr. R. Dubiel of your staff on February

'

Areas examined during this inspection are desc

Within these areas, the inspection consisted of selective

examinations of procedures and representativ

letter.

inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's

enclosed inspection report will be placed in the NR

believe to be proprietary, it is necessary that you make a written

Room.

application within 20 days to this office to withhold such

affidavit executed by the owner of the information, which identifies the

from public disclosure.

document or part sought to be withheld, and which contains a statemen

of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of S

The information sought to be withheld shall be incorporated as

If we do not

far as possible into a separate part of the affidavit. h

2.790.

-

(

will be placed in the Public Document Room.

l

> y R.M

g

- -

'

7904

oea

1

-

Metropolitan Edison Company

2

No reply to this letter is required; however, should you have any

questions concerning this inspection, we will be pleased to discuss them

with you.

-

Sincerely,

j

f

-

Paul R. Nelson, Chief

Fuel Facility and Materials Safety

Branch

Enclosure:

Office of Inspection and Enforcement

Inspection Report Number 50-320/78-04

,

cc w/ encl:

i

'

R. L. Wayne, QA Manager, Design & Construction

i

T. Broughton, Safety & Licensing Manager

R. W. Heward, Jr. , Project Manager

R. C. Arnold, Vice President, Generation

L. L. Lawyer, Manager, Generation Operations - Nuclear

G. P. Miller, Superintendent

J. L. Seelinger, Unit 2 Superintendent

Gerald Charnoff, Esquire

Miss Mary V. Southard, Chairman, Citizens for a safe Environment

(Without Report)

.

I. . i

,lr~2.'?2,

-

e .