ML19220B338

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-320/77-13 on 770331.No Noncompliance Noted
ML19220B338
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/15/1977
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
Shared Package
ML19220B339 List:
References
NUDOCS 7904250649
Download: ML19220B338 (2)


See also: IR 05000320/1977013

Text

'

-

( @MA ( bES

--

,

,

f

f

UNITED OTATES

g,

NUCLEAR R E GULATOR Y COMMtsslON

,

. , .

'(fQ l

-

REGION 1

.

-

531 P ARK AVENUE

so

KING OF PR U556 A. PENN5Yt.V ANI A 19406

,,,

,,

April 15, 1977

Docket No. 50-320

Metropolitan Edison Company

ATTN: Mr. R. C. Arnold

Vice President

P. O. Box 542

Reading, Pennsylvania 19603

Gentlemen:

Subject:

Inspection 50-320/77-13

This refers to the inspection conducted by Mr. A. E. Finkel of this

2

office on March 31, 1977, of activities authorized by NRC License No.

CPPR-66 and to the discussions of our findings held by Mr. Finkel with

Mr. J. Torcivia and others of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the Office of

(

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative recori:, interviews with

i

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice". Part

2. Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room. If this report contains any infonnation that you (or your con-

tractor) believe to be proprietary, it is necessary that you make a

written application within 20 days to this office to withhold such

information from public disclosure. Any such application must be accompa_nied

by an affidavit executed by the owner of the infonnation, which identifies

the document or part sought to be withheld, and which contains a statement

.

.

.

'i30425 09/% M 1

,

.

.

-

Metropolitan Edison Company

2

.

of reasons which addresses with specificity the items which will be con-

sidered by the Commission as listed in subparagraph (b)(4) of Section

2.790.

The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If wa do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

No reoly to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

4.

-

Robert T. Carlso

ief

Reactor Construction and Engir.eering

Support Branch

Enclosure:

Office of Inspection and Enforcement

Inspection Report Number 50-320/77-13

'

cc w/ encl:

R. L. Wayne, QA Manager, Design and Construction

T. M. Crimmins, Jr., Safety & Licensing Manager

R. W. Heward, Jr., Project Manager

W. A. Verrochi, Vice President, Design & Construction

Gerald Charnoff, Esquire -

Miss Mary V. Southard, Chairman Citizens for a Safe

Environment (Without Report)

,

{

-

I

~

,b 173

i

-

..

. .- . - . - - -

._

.

. - .