ML19220B298
| ML19220B298 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/29/1976 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Arnold R METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19220B299 | List: |
| References | |
| NUDOCS 7904250604 | |
| Download: ML19220B298 (2) | |
See also: IR 05000320/1976015
Text
.
.
-
CecdenL
fIo
-
,
-
%,
UNITEo STATES
f
,t
NUCLEAR REGULATORY COMMISSIOfJ
'
E
'C/ [ f'[ $
,
RectoM i
5 * v, Dof ,. [
631 PA AK AVCNUE
KtNG OF PRUSSI A. PENNSY LV ANI A 19406
DI
.
,[
% . ...e
OCT 2 9 075
License No. CPPR-66
Metropolitan Edison Company
Attention:
Mr. R. C. Arnold
Inspection No. 76-15
Vice President
Docket No. 50-320
P. O. Box 542
Reading, Pennsylvania 19603
Genticcen:
This refers to the inspection conducted by Mr. L. Narrow of this office
on October 13-15, 1976 at Middletown, Pennsylvania of activities authorized
by NRC License No. CPPR-66 and to the discussions of our findings held
by Mr. Narrow with Mr. Levin and other memb_rs of your staff at the
'
conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Repcrt which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of precedures and representative records, intervicus with
,
personnel. and observations by the inspector.
Within the scope of this inspection, no items of noncocpliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Dccument
Room. If this report contains any information that you (or your con-
tractor) believe to be proprietary, it is necessary that you make a
written application within 20 dcys to this office to withhold such
information from public disclosure. Any such application must be accom-
panied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains
a stateuent of reasons which addresses with specificity the items which
will be considered by the Co= mission as listed in subparagraph (b)(4) of
The information sought to be withheld shall be incorporated
.Section 2.790.
If we do not
as far as poesible into a separate part of the af fidavit.
hear from you in this regard within the specified period, the report
will be placed in the Public Document Roco.
~.
,..
,..0
\\'-
- 4
. t-
!
79042506d
-
_
,
b ; c r (f
Q
-
-
y
4
,
.
-
~~
-2
.
No reply to this letter is required; heaever, should yea have any
questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
W
.
Robert T. Carlson, Chief
__
Reactor Construction and Engineering
Support Branch
Enclosure:
IE Inspection Report No. 50-320/76-15
cc:
R. L. Wayne, QA Manager, Design and Construction
T. M. Cri= mins, Jr., Safety & Licensing Manager
P. W. Heward, Jr. , Proj ect Manager
W. A. Verrochi, Vice President, Design & Construction
Gerald Charnoff, Esquire
1.iss Mary V. Southard, Chcirman Cizens for a Safe Environment
(Without Report)
s
74
"El
.
.
'
t
"
.