ML19220B282

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-320/75-01 on 750122-23. No Noncompliance Noted
ML19220B282
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/31/1975
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
Shared Package
ML19220B283 List:
References
NUDOCS 7904250586
Download: ML19220B282 (2)


See also: IR 05000320/1975001

Text

1

.

.

' *-

f-

.

_.

UNil[D c1Al[c

'

g

nucttAn ntcutATony co . . insio :

l

,

HEclo J l

4

$31PANK AVENUC

KIN G O F P R USSI A. PE N N SY L V Khl A 19406

Jtdi 3 1 E73

Metropolitan Edison Company

License No. CPPR-66

Attention:

Mr. R. C. Arnold

Inspection No. 50-320/75-01

Vice President

P.O. Eox 542

.

[

Reading, Pennsylvania

19603

\\

-

.

Centlenen:

g

This refers to the inspection conducted by Mr. Folsom of this

e

office on January 22-23, 1975 at Flddleto n, Pennsylvania of activities

{

authori cd by AEC License No. CPPR-66 and to the discussions of

j

our findings held by Mr. Folsom with Mr. Levin and Mr. Stromberg of

j

your staff at the conclusion of the inspectien.

.

1

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed

with this letter. Within these areas, the inspection consisted

of selective examinations of procedures and representative records,

interviews with personnel and observations by the inspector.

,

Within the scope of this inspection, no items of noncompliance

were observed.

In accordance with Section 2.790 of the AEC's " Rules of Practice",

,

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter and the enclosed inspection report vill be placed in the

i

NRC's Public Document Room.

If this report contains any information

that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to

this office to withhold such information from public disclosure.

'

Any such application cust include a full statement of the

reasons on the basis of which it is claimed that the information

is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a

separate part of the document.

If we do not hear from you in

this regard within the specified period, the report vill be

,

placed in the Public Documen. Room.

_

O

,9 '^

og

h

5

<

(

e

e

-

,

5 V

  • ~7

h

g

(bd%h' /

7904350NS6

-

E

!

.

... . #

,

l) hT O ,U

'f

<

,,

. - -

-

.

.

.'

_2_

should jou have any

No reply to this letter is required; however, be pleased to discuss

questions concerning this inspection, we vill

,

them with you.

Sincerely,

/ edy7 [ k % w

Chief

Robert T. Carlson,

Facility Construction and Engineerir.g

Support Branch

Enclosure:

50-320/75-01

ISE Inspection Report No.

R. L. Wayne, QA Manager, Design & Construction

Saf ety & Licensing Manager

cc:

T. M. Crir ins, Jr.,

R. W. Heward, Jr., Project ManagerDesign & Construction

W. A. Verrochi, Vice President,

Gerald Charnoff, Esquire

.

.

bec: (w/encis)

I&E Chief, FS&EB

I&E:HQ (5)

DL (4 w/encls plus 9 cpys.of report only)

DR Central Files

RS (3)

PDR

Local PDR

I&E Files

NSIC

TIC

State of Pennsylvania

i

ent

Miss Mary V. Southard, Chairman, Citizens for a Safe Env ronm

REG:I Reading Room

,

_

m

g y

.>

'

.

-

j

.

'-

_

h