ML19220B282
| ML19220B282 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 01/31/1975 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Arnold R METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19220B283 | List: |
| References | |
| NUDOCS 7904250586 | |
| Download: ML19220B282 (2) | |
See also: IR 05000320/1975001
Text
1
.
.
' *-
f-
.
_.
UNil[D c1Al[c
'
g
nucttAn ntcutATony co . . insio :
l
,
HEclo J l
4
$31PANK AVENUC
KIN G O F P R USSI A. PE N N SY L V Khl A 19406
Jtdi 3 1 E73
Metropolitan Edison Company
License No. CPPR-66
Attention:
Mr. R. C. Arnold
Inspection No. 50-320/75-01
Vice President
P.O. Eox 542
.
[
Reading, Pennsylvania
19603
\\
-
.
Centlenen:
g
This refers to the inspection conducted by Mr. Folsom of this
e
office on January 22-23, 1975 at Flddleto n, Pennsylvania of activities
{
authori cd by AEC License No. CPPR-66 and to the discussions of
j
our findings held by Mr. Folsom with Mr. Levin and Mr. Stromberg of
j
your staff at the conclusion of the inspectien.
.
1
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed
with this letter. Within these areas, the inspection consisted
of selective examinations of procedures and representative records,
interviews with personnel and observations by the inspector.
,
Within the scope of this inspection, no items of noncompliance
were observed.
In accordance with Section 2.790 of the AEC's " Rules of Practice",
,
Part 2, Title 10, Code of Federal Regulations, a copy of this
letter and the enclosed inspection report vill be placed in the
i
NRC's Public Document Room.
If this report contains any information
that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to
this office to withhold such information from public disclosure.
'
Any such application cust include a full statement of the
reasons on the basis of which it is claimed that the information
is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a
separate part of the document.
If we do not hear from you in
this regard within the specified period, the report vill be
,
placed in the Public Documen. Room.
_
O
,9 '^
og
h
5
<
(
e
e
-
,
5 V
- ~7
h
g
(bd%h' /
7904350NS6
-
E
!
.
... . #
,
l) hT O ,U
'f
<
,,
. - -
-
.
.
.'
_2_
should jou have any
No reply to this letter is required; however, be pleased to discuss
questions concerning this inspection, we vill
,
them with you.
Sincerely,
/ edy7 [ k % w
Chief
Robert T. Carlson,
Facility Construction and Engineerir.g
Support Branch
Enclosure:
50-320/75-01
ISE Inspection Report No.
R. L. Wayne, QA Manager, Design & Construction
Saf ety & Licensing Manager
cc:
T. M. Crir ins, Jr.,
R. W. Heward, Jr., Project ManagerDesign & Construction
W. A. Verrochi, Vice President,
Gerald Charnoff, Esquire
.
.
bec: (w/encis)
I&E Chief, FS&EB
I&E:HQ (5)
DL (4 w/encls plus 9 cpys.of report only)
DR Central Files
RS (3)
Local PDR
I&E Files
State of Pennsylvania
i
ent
Miss Mary V. Southard, Chairman, Citizens for a Safe Env ronm
REG:I Reading Room
,
_
m
g y
.>
'
.
-
j
.
'-
_
h