ML19220B226

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-320/78-08 on 780118-20.No Noncompliance Noted
ML19220B226
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/27/1978
From: Nelson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19220B228 List:
References
NUDOCS 7904250521
Download: ML19220B226 (2)


See also: IR 05000320/1978008

Text

.

.-

a g ,

cEWfML f"E5

'

--

UNIT ED ST AT ES

S[ "%qA

NUCLE AR REGULATORY COMMtsstON

necion i

y% - <[,

i

'

631 PARK AVENUE

19406

'

M

f

Kino or PausSI A PENNSYLV ANI A

} j

c,b a h_/ 5

....f

-

TG 2 7 MS

Docket No. 50-320j^c.'

Metropolitan Edison Company

-

ATTN: Mr. J. G. Herbein

-

Vice President

P. O. Box 542

Reading, Pennsylvania 19603

Gentlemen:

Subject:

Inspection 50-320/78-08

This refers to the inspection conducted by Dr. R. Bores of th

Reading, Pennsylvania, and at Three Mile Island Nuclear Station, Un

on January 18-20, 1978,

in Middletown, Pennsylvania of activities authorized by NRC License No.

CPPR-66 and to the discussions of our firdings held by Dr. Bores with

e

Mr. Dubiel, Dr. Jenckes and others of your staff a

Miller, Seelinger and Dubiel and Dr. Bcres on February 2,1978.

Areas examined during this inspection are descr

Within these areas, the inspection consisted of selective

examinations of procedures and representative records, inttrviews with

l etter.

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with e ttion 2.790 of the NRC's " Rules of P

e

enclosed inspection report ivill be placed in the NRC

2, Title 10, Code t. ,

believe to be proprietary, it is necessary that you make a written

Room.

application within 20 days to this office to withhold such

h

affidavit executed by the owner of the infomation, which identifies t e

from public disclosure.

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b)(4) of Sec

The information sought to be withheld shall be incorporated as

,

t

If we do not

far as possible into a separate part of the affidavit.

2.790.

j

-

.

64)

mm

_

.

<

-

NM2505p( 1 t ;c w

Cv

\\

.

.

.

Metropolitan Edison Company

2

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

No reply to this letter is required; however, should you have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

[

f

~

Paul R. Nelson, Chief

Fuel Facility and Materials Safety

Branch

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-320/78-08

cc w/ enc 1:

R. L. Wayne, QA Manager, Design & Construction

T. Broughton, Safety & Licensing Manager

R. W. Heward, Jr. , Project Manager

R. C. Arnold, Vice President, Generation

L. L. Lawyer, Manager, Generation Operations - Nuclear

G. P. Miller, Superintendent

J. L. Seelinger, Unit 2 Superintendent

Gerald Charnoff, Esquire

Miss Mary V. Southard, Chairman, Citizens for a Safe Environment

(Without Report)

.

l

!

,

i

'

!

,

/4 - (??'T

I

.

    • W

"* M"N6 m m e-m

,,

, , ,