ML19220B191
| ML19220B191 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 03/15/1976 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Arnold R METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19220B192 | List: |
| References | |
| NUDOCS 7904250502 | |
| Download: ML19220B191 (2) | |
See also: IR 05000320/1976004
Text
'
.*
,
__
*. , , /
_
-
( _
,s
UNITEo STATES
,
^
'
NUCLEAR HEGULATORY COMMISSION
.
REGION I
S31 P A AK AVE NUE
KING O F PRUSSI A. PENN5Yl.V ANI A 19406
.
tgR 151373
-
i
License No. CPPR-66
-
Metropolitan Edison Company
Attention:
Mr. R. C. Arnold
Inspection No. 76-04
,
Docket Nc. 50-320
.
Vice Pzesident
?
P. O. Box 542
Reading, Pennsylvania
19603
Gentlemen:
This refers to the inspection conducted by Mr. L. Narrow of this of fice
on February 23-25, 1976 at Middletown, Pennsylvania of activir.ies autho-
rized by NRC License No. CPPR-66 and to the discussions of our findings
the
held by Mr. Narrow with Mr. Levin and other members of your staff at
conclusion of the inspection, and to a subsequent telephone discussion
between Mr. Narrow and Mr. Levin on February 27, 1976.
Areas examined during this inspection are described in the Office of
Inspection and Enforce =ent inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
~uiterviews with
examinations of procedures and representative recorA ,
per sonnel, and observations by the inspector.
,
Within the scope of this inspection, no items of nonce =pliance were
observed.
.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this
letter and the enclosed inspection report will b2 placed in the NRC's
Public Document Room.
If this report contains any information that jou
(or your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full state =ent of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
.
g#' %g
,g cOS
(
Q
"m k
D
a
x
3
~
7904250;g)
~~
.
\\
'n .#
s
cG7
s
sU M,
-
%
,
'
..
-
-
.
_2_
.
No reply to this letter is required; however, should you have ay
=
questions c~
2rning this inspection, we will be pleased to discuss
them with you.
Sincerely,
O~
/
w
Robert T. Carlson, Chief
Reactor Construction and Engineering
Support Eranch
Enclosure:
IE:I Inspection Report No. 76-04
cc:
R. L. Wayne, QA Manager, Design and Construction
T. M. Cri== ins, Jr. , Saf ety & Licensing Manager
R. W. Heward, Jr. , Proj ect Manager
W. A. Verrochi, Vice President, Design & Construction
Gerald Charnoff, Esquire
Miss Mary V. Southard, Chairman Citizens for a Saf e Environment
'
(Without Report i
.
bec: (W/encis)
IE Mail & Files (For Appropriate Distribution)
Local PDR
REG:I Reading Room
Miss Mary V. Southard, Chairman Citizens for a
.
Safe Environment
State of Pennsylvania
.
-
74 007
.
'
. . -
.
e