IE Insp Rept 50-320/75-02 on 750220-21.Noncompliance Noted: Power & Control Cables Stored Outdoors on Partially Filled Reels Were Not Sealed
ML19220A915
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/17/1975
From: Folsom S, Gage L, Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19220A903 List:
References
50-320-75-02, 50-320-75-2, NUDOCS 7904250089
Download: ML19220A915 (16)


See also: IR 05000320/1975002

Text

.

.

.

.

,

.

IE:I Forn 12

l

.

(Jan 75) (P.cv)

,

U.S. liUCLEAR RECULATORY CO::MISSIO:1

0FFICE OF II;SPECTIC:t A ;D DIFORCEME;T

.

.RECION I

t

50-320

50-320/75-02

Dodet No.

IE Inspection F2 port 2:o:

CPPR-66

l' tr p lit n Ediscn Cenpany

Licence !!o:

Licensee:

s.

.

._

Box 542

pg

,,

Reading, Pennsylvania

19603

A

liiddletown Dauphin County, Pa. (Three liile

Safe p ds

Location:

~

Island 2)

Croup:

.

Pk'R, 871 INe (B&W)

Type of Licensec:

,.

Routine, Unannounced

Type of Inspection:

February 20-21, 1975

Dates of Inspection:

J nuary 22-23, 1975

Dates of Previous Inspection:

,

3 //

Ok

-

,

Reporting Inspector:

~

'

Date

Seth A. Folsem, Reactor Inspector

$

.

4'h.'

/t t.

iA/// 23

t

Accompanying Inspectors:

s

L. W. Cage, ReaQr Inspect %f '

Date

'

S

_ hb

l0%

tt.2

/ / //9j~

'

<

6

Date

L. Narrow, Reacter Inspecf r/

.

Date

,

.

4%

Date

NONE

Other Acco=panying Personnel:

_

Date

,

O[2,)

Reviewed By:

_

l

R. F. Heishman, Senior Reactor Inspector

bate

'

-

,

'

l,

i

"(~ 1

') C n

d

.L

.w

.

.

7 0042 5 0c ?<f

.

SUmiARY OF FINDINGS

-

.

Enforcement Action

A.

Items of Moncemoliance

1.

Deficiencies

'

Contrary to the requirements of 10 CFR 50, Appendix B,

stored outdoors on

a.

Criterion V, power and control cables,

partially filled reels, were not protectively sealed in

(Details,

accordance with vendor supplied procedures.

Paragraph 2)

Contrary to the requirements of 10 CFR 50, Appendix ? ,

b.

Criterion XIII, asbestos-braided instrumentation cables

were stored in areas unprotected from rain, snow, and

ground water.

(Details, Paragraph 3)

Contrary to the requirements of 10 CFR 50, Appendix B,

Criterion XV, nonconforming (scrapped) cabic was stored

c.

(De-

in the same area as conf orming (accepted) cabic.

tails, Paragraph 4)

'

.

B.

Deviations

.

None

,

licensee Action on Previous 1v Identified Enforcement Matters

-

The f ollowing previously identified enforcement matters were resolved

during the inspection:

Embedment of temporary polar crane support towers in permanent

1.

(Details, Paragraph 8)

containment concrete.

(Details ,

Heating of reinforcing steel to unknown temperatures.

2.

Paragraph 9)

Design Channes_

_

None Identified

Unusual Occurrences

(

None Identified

c4- Jc Q

'

( .)

...a

_

.

m

I.

?

-2-

.

!

Other Significant Findines

A.

Current Find'ncs

.

1.

Unresolved It ems

The Site Quality Control Procedure No. QC-17-2 " Control

a.

of Nonconf orming Conditions" did not refenence the

architect-engineer's " Vendor Data Status Report" which

is used in conjunction with the procedure to determine

acceptability of vendor documentation.

This item is

considered unresolved.

(Details, Paragraph 13)

The B&W procedures permit inst'allation of nonconfo' ming

r

b.

items, " Caution" tagged, with the concurrence of the

Field Project Engineer, Field QC Supervisor, and the

_

licensee.

For items which UE&C has QC responsibility " Qualified

Release" is controlled by Procedure QC-17-2.

For items

which B6W has QC responsibility t'iere are no written re-

quirements established to control " Qualified Release".

This item is considered unresc1ved.

(Details, Paragraph 5)

f

.

Acceptable Items

2.

The f ollowing items were examined and, with the exception of

the "ltems of Nonec=pliance" and " Unresolved Items" listed

above, are. considered to be acceptable.

.

Procedures for control of nonconforming piping items.

_

a.

(Details, Paragraph 5)

b.

Procedures for quality assurance / quality control of

piping installations.

(Details, Paragraph 7)

Conformance of NDE techniques, personnel, record keeping,

c.

and equipment to applicable codes and standards.

(Details,

Paragraph 14)

d.

Procedures f or calibration of nondestructive examinations

and welding equipment.

(Details, Paragraph 14)

_

~

Procedures for control of weld materials.

(Details,

.

e.

Paragraph 14)

-

.

_

$

-

(.

,,..a

-

__

..

- 3-

f.

Quarantine of nonconforming caterials.

(Details,

Paragraph 4)

.

L.

Status of Previously Renorted I'nresolved iteen

The following previously identified ite= were resolved during

the' inspection:

s.

a.

Splice plate dropped into reactor pressure vessel.

(Details, Paragraph 10)

b.

In-t rans it dacage to reactor coolant nozzle.

(Details,

Paragraph 11)

c.

Apparent below-standard concrete in containment structure.

_

(Details, Paragraph 6)

-

d.

Periodic battery check acceptance criteria.

(Details,

Pacagraph 12)

Management Intervieu

The management interview was held at the site on February 21, 1975, with

the following personnel in attendance:

'

General Public Utilities Service Company

Mr. R. F. Fenti, Quality Assurance Auditor

~

Mr. G. L. Kopp, Quality Assurance Auditor

Mr. S. Levin, Proj ect Engineer

Mr. P

A. Levine, Quality Assurance Auditor

Mr. G. L. Roshy, Quality Assurance Engineer

Mr. M. J. Stromberg, Site Quality Assurance Auditor

Mr. J. H. Wright, Resident Civil Engineer

.

Babcock & Wilcox

Mr. B. E. Treadway, Proj ect }bnager

Mr. R. J. Kunz, Quality Control Supervisor

_

m

-

,

3C0

-

t .s

-

I

.

-

I

_

M

-4-

United Encineers and Constructorr

Mr. V. E. Cichocki, Coordinating Superintendent, Quality , Assuranec /

Quality Centrol

Mr.

C. W. Hunter, Electrical Supervisor

Mr. D. C. Lambert, Field Supervisor, Quality Control

Eurns and Roe

s

Mr. T. R. Block, Site Lead Quality Assurance Engineer

Mr. C. T. Harper, Jr. , Site Proj ect Engineer

The following was discussed:

i

1.

The inspector discussed the " Criteria for betermining Enforcement

_

Action and Categories of Noncompliance with AEC Regulatory Require-

cents - lbdifications", dated December 31, 1974.

The licensee

acknowledged this information.

2.

The inspector stated that three items of nencompliance, each

categorized as a deficiency, had been identified at this inspection.

It was observed that power and control cables, stored outdoors

a.

on partially filled reels, were not protectively sealed in

accordance with vendor-supplied procedures.

This is considered

to be a violation of Criterion V of Appendix B,10 CFR 50.

(Details, Paragraph 2)

b.

It was observed that asbestos-braided instrument cables were

stored in areas unprotected from rain, snow, and ground water.

-

This is considered to be a violation of Criterion XIII of

App en dix B.

(Details, Paragraph 3)

It was observed that nonconforming (scrapped) cable was stored

c.

in the same area as conforming (accepted) cable.

This is con-

sidered to be a violation of Criterion XV of Appendix B.

(Details, Paragraph 4)

The licensee acknowledged this inf or=ation.

3.

The inspector stated that the following items were considered

-

unresolved:

For items which BUJ has QC responsibility, there are no written

a.

requirements established to control " Qualified Release". (Details,

Paragraph 5)

_

'

71 3C1

-

.

- 5-

Procedure No. QC-17-2 did not ref erence the architect-engineer's

,

l

" Vendor Data Status Report".

(Details, Paragraph 13)

b.

.

.

The licensee acknowledged this information.

the f ollowing previously identified items

4.

The inspector stated that

.

had been resolved:

(Details,

Splice p3..tc drepped into reactor pressure vessel.

,

a.

Paragraph 10)

(Details,

In-transit damage to reactor coolant no::le.

b.

Paragraph 11)

Embed =ent of tecporary polar crane suppcrt towers in percanent

c.

(Details, Paragraph 8)

concrete.

structure.

Apparent below standard concrete in containment

d.

(Details, Paragraph 6)

(Details,

Periodic battery check acceptance criteria.

e.

-Paragraph 12)

(Details,

Heating of reinforcing steel to unknown te=peratures.

i

f.

Paragraph 9)

.

The licensee acknowledged this inf ormation.

The inspector stated that the items listed below had been examined

during the inspection, and were considered to be acceptable, except

_

5.

for the previously stated items.

(Details ,

Procedures f or control of nonconforming items.

a.

Paragraph 5)

' Procedures f or quality assurance / quality control of piping

b.

installation.

(Details, Paragraph 7)

Conf ormance of NDE techniques, personnel, record keeping, and

(Details,

equipment to applicable codes and standards.

c.

Paragraph 14)

_

-

.

_

,

~

_

.

S

=

'

- c,

Procedures f or calibration of nondestructive examination and

d.

welding equipment.

(Details, Paragraph 14)

.

Procedures for control of weld materials.

(Details,

c.

Paragraph 14)

(Letails, Paragraph 4)

Quarantine of non-conforning caterials.

f.

s,

,

'Ihe licensee acknowledged this inf ormation -

.

D

.

.

.

.

-

G

_

f

's

W

$

a. L4

_

.

  1. ,

.

DETAILS

.

.

1.

Persons contacted

General Public Utilities Service Compan_v

Mr. R. F. Fenti, Quality Assurance Auditor

'

,

Mr. C. L. Kopp, Qual ty Assurance Auditor

Mr. S. Levin, Proje. En gin eer

}k. P. A. Levine, Q iity Assurr ce Auditor

Mr. G. L. Roshy, Quality Assurs' s En-ineer

Mr. M. J. Stremberg, Site Qualaty Assur cica Auditor

ik. J. H. Wright, Residant Civil Engineer

Babcock and Uilcox

_

-

Mr. R. J. Kunr, Quality Control Supervisor

Mr. B. E. Treadway, Proj ect Manager

United Encineers and Constructors

Mr. V. E. Cichocki, QA/QC Coordinating Superintendent

Mr. J. P. Fleming, Chief Test Engineer

'

Mr. C. W. Hunter, Electrical Supervisor

Mr. D. C. Lambert, Field Supervisor, Quality Control

Mr. F. F. Long, Assistant Field Supervisor, Quality Control

Burns and Roe

.Mr. T. E. Block, Site Lead Quality Assurance Engineer

-

Mr. G. T. Harper, Jr. , Site Project Engineer

,

2.

Protective Seals on Power and Control Cables

The inspector examined the storage conditions of the approximately

100 partially filled reels of power and control cables lef t over

from the construction of Unit No. 1, for use.on Unit No. 2.

The

cables were stored outdoors, with the cable ends nonunif ormly

protected with electrician's or friction tape.

The constructor's Procedure ECP-3-2, Revisicu 6, Paragraph 4.4.4

~

sta+cd "The ends of all cable / wire stored outside shall be scaled

-

to prevent the entrance of moisture". No method for scaling the

cable was provided.

'

.

-

,

-

-8-

The cable Purchase Order No. C-0084, and ref erenced Specification

No. 2555-68, Amendnent 5, Paragraph 4.0 states " Contractor shall

furnish instructions on the reccarended methods for the storage

"

of the cables".

Tne contractor provided the licensee, in Engineering Memorandum

N o .. 129, dated September 16, 1971, with scaling instructions which

included stripping the cable ends crd sealing with four layers of

insulating tape f ollowed by two layers of f riction bape and one

layer of vinyl electrical tape.

Failure to f ollow this sealing procedure on t _ cable ends is con-

sidered to be a deficiency in noncompliance with Criterion V of

10 CFR 50, A.ppendix B.

3.

12ck of Protection f rom Water f or Instrument-tion Cables

_

The inspector examined the instrumentation cable storage conditions.

The cable was stored in a shed whose f our sides were protected by a

wide-cesh wire f ence which af forded no protection from rain or

snow. Four reels of Type 15FI asbestos-braided instru=entation

cable were f ound :tn an area reserved f or power cable.

Tnese were

covered by a tarpaulin, but were in direct contact with the unpaved

ground, and were exposed to ground water.

,

These storage conditions were not in accord with' the requirements of

Specification No. 2555-106, Amendment 4, Paragraph 3.8.2.4, and

Specification No. DS38948-1, June,1971.

.

.

Failure to store the instrumentation cable properly is considered

to be a deficiency in noncompliance with Criterion XIII of 10 CFR

-

50, Appendix 3.

_

4.

Nonsenrecation of Scrapped Cable

The inspector examined the outdoor cable yard used for storage of

conforming power and control cable,

Several reels of nonconforming

(scrapped) cable were found among t.he reels of accepted cable with

nothing in evidenca to identify the cable as nonconforming.

The f ailure to prevent inadvertent use of nonconiorming material is

considered to be a deficiency in noncompliance with Criterion XV of

_

10 CFR 50, Appendix B.

-

  • /1 3C5

_

_

.

.

h

I

9-

,

t

Installatien of Nonconformine Items

S.

for control-

The inspector examined the f ollowi g QA/QC procedures

1 Lng the release of nonconforming items.

B&W Procedure 9-QA-13/C-6 dated November 4,197410 dated Dec

-

a.

UT&C Pr ocedure QC-17-2 Rev.

'

i

items

b.

s

Section 3 of Procedure 9-QA-13/C-6 requires that nonconf.or

be tagged with a " Reject"

" tag.

The use of

items if they are tagged with a yellcw "Cautionce of the B&W Field

the " Caution" tag requires documented concurren

l of the

Project Engineer and Field QC Supervisor as vell as approva

,

licensee.

f ming

Procedure QC-17-2 provides for " Qualified Release" of noncon or

QA lbnager

-

ites if approved by the licensee Site Project Manager,Such items are taggad w

and the A-E Site Project Manager. Category I Qualified Release

h permit

Section IV of this procedure establishes conditiens whic

Qualified Release of nonconforming items.

2

The inspector asked if the cenditions of Section IV of QC-17-The A-E

applied to B&W installed equipment.that they did apply to such

d r control by

,

f the equipment

'

the A-E's QC group but did not apply' af ter release o

to B&W., ner to materials purchased direc;1y by B6W.

.

This item is unresolved.

Apoarent Below Standard Concrete in Centain=ent

_

6.

i

break

The inspector examined the concrete rest cylinde

i

t con-

h.

The data now

crete which appeared to be sub-standard in st*cngt

i

break results were within the requirements of th

This item is resolved.

applicable code.

Eoundary Piping

QA/0C Procedures _ - Reactor Coolant Prespr71

7.

_

fied

-

The inspector examined selected QA/QC proc

.

(s

ry g ;c,O

_

v(~ n -o(

1

e

W

i,

i

-10-

Pressure Boundary piping and the architect-engineer for conformance

to the require =ents of the licensee's application.

.

.

a.

The ELW Quality Assurance P.anual describes the quality program

of this contractor sad establishes the policy governing per-

f orrance of quality related activities.

It provides for

independence and f reeden of action of QA/QC personnel including

,

stop work authority and establishes the require:ents for per-

f ormance and documentatien of audits.

This ite: is considered

to be acceptable

b.

The foll.owing BLU Quality Control Procedures were examined:

No. 9A-117-1/C-6 "St ora ge Requirements"

No. 9A-ll7-2/C-6 ""aterials Control"

No. 9A-ll7-2/C-6 " Preventive Maintenance"

No. 9A-125/C-6 " Field Construction Procedure for Installation

at Pipiny Systems"

No. 9A-126/C-6 " Procedures f or 11and. ling Deviation to Field

Construction Procedures"

No. 9A-128/C-6 " Cleanliness Requirements"

nese procedures provide requirements for

.e

.'ing control

,

records; Heat treatment activities; weldag t epairs; receiving

inspection and storage; work perfor=ane.e; and witressing and

inspection of work performed f or lascallation of tce RCPn

P ping.

i

c.

The A-E's QC procedures listed be.',ov were examined:

QC-9C-2 " Nuclear Steam Supply Syt t . 2 Installation"

-

QC-2-2 " Receiving Inspection"

QC-3-2 " Storage Control"

QC-7A-2 "QC Surveillance Plan"

nese procedures provide the require =ents for receiving inspec-

tion and storage of material for the RCPB piping and for sur-

veillance of the work by B&W on this system.

H is item is considered to be acceptable.

_

'

.

=

l

.p

,

g

p.

l

8

LL/

.

i

_

-11-

8.

Embed:ent of Tc porary Crane Support in Permanent Conc re t e

The inspector exacined the docume: tation relating to the embedment

of the temporary crane support in the containment structure con-

trete.

This included change orders, drawings, concrete placcren*

sheets, and quality centrol records.

In addition, a Division of

Reactor Licensing letter to the licensee, dated Februar;

7, 1975

stated, in part ". . .we find that the structural inte.grity of the

concrete walls containing the c bedded structural steel has not

been impair ed. . . ".

This itcs is resolved.

9.

Heatinc

.f Reinf ercine Steel to Unknown Tenocratures

The licensee had cut off 6 inche: from the ends of twelve reinfore-

ing steel bars to re=ove the portions which had been subjected to

uncontrolled heating.

The inspector examined these bars, and the

-

No.

supporting docunentation which included "UELC Deviation Report

0386", dated December 26, 1974.

This item is resolved.

10.

Solice Plate Droceed into Reactor Pressure Vessel

The inspector examined the following docu=entation relating to the

investigation and NDE on the reactor pressure vessel interior:

?

B&W letter to licensee, October 8,1972

enclosing report on

e

a.

UT and ET examination of reactor vessel,

b.

B&W " Report of Inspection", Procedure No. BLI-2, Reactor

Vessel Cladding, September 26, 1972, which included details

of UT, couplant, calibraticn, and gage blocks.

,

This item is resolved.

11.

In-Transit Damare to Reactor Coolant Piping

The inspector examined the following documentation relating to the

repair and NDE of the weld prep of the outlet pipe assembly damaged

in transit.

B&W Contract Variation CV 206-23 FEV, November 28, 1972, which

a.

included sketches of repair areas.

_

b.

B&W Ictter to licensee, December 14, 1972 which stated in part,

"This letter . . . certifies that the f abrication. . . has been

co=pleted. Based on the above, QC release is granted on the

above referenced component".

This item is resolved.

cg - nrq

-

s;

i. t s

l

.

-

,

.

-12-

Periodic Battery Check Acceptance Criteria

12.

he

The inspector examined the newly r tvised instructions regarding tinstructions

l

The

interpretation of battery check readings.f or exampic; raximum volta ge variation

(not less than 1.220).

frequency of readings,

(plus or minus 0.04 volts), snecific gravity

'

This item is resolved.

s.

in Site Precedure for Nenconformances

13.

Reference

The inspector reviewed the use of Site Quality Centrol Procedure

The latest

No. QC-17-2, " Control of Ncnconf orning Conditf or.s".Fevision 10,, Dec

revision of this precedure,

Report",

not reference the architect-engineer's " Vendor Data Status

'

Pro-

which is prepared in accordance with the architect-engineer sis used in conjunctio

This report

j ect Procedure No. SP-84-19.with the procedure to determine the ac

f vender data.

This itet is resolved.

Nondestructive Exanination OA/QC Procedures

14.

The inspector examined the f ollowing QA/QC procedures relating to ,

applicability

NDE techniques, persennel, records, and equipment;

i

t

to codes and standards; calibration of NDE and welding equ pecn ,

i

velding materials control.

B&W QC Manual - Procedures all refer to " Applicable Fabrication

Code - ASME,Section III, 1971 Edition".

.

a.

B&W "NDT Personnni Certification Record" - listing " Level of

Test" f or example. Level II, SNT-TCIA Supplement A (CP-5A)

b.

97-101/C-6, Revision 0,

B&W " Calibration Control Progran No. periodic inspection of gages

c.

10, 1973",

October

instruments as required by the ASME Code.

9A, 144,

B&W " Preventive Maintenance for NDE dquipecnt" No.

MT equipment

d.

C-6, Revision 0, October 1,1973", RT equipment,

cleaniag and maintenance.

O, and

~

B&W " Control of Weld tutcrials" 9A-107-1/C-6, Rev.

e.

9A-158/C-6, Rev. 1.

.

These procedures were considcred acceptable.

_