p %el ALfS

,.

-

g" "G W

UNITED ST AT ES

g

f5

.C.

NUCLEAR REGULATORY COMMisslON

.

,# Y>e(

5

'

g

REGION l

E

531 P AmK AVENUC

o,$.2d6/ f

niNo oP PRUS$1 A. PENNSY LV ANI A 19406

\\ C ; -* f

  • ...a

YE

Docket No. 50-320

Metropolitan Edison Company

ATTN: Mr. J. G. Herbein

Vice President.

P. C. Box 542

Reading, Pennsylvania 19603

Gentlemen:

Subject:

Inspection 50-320/77-41

This refers to the inspection conducted by Mr. P. Kellogg of this office

on October 25-28, 1977, at Three Mile Island Nuclear Station, Unit 2,

of activities authori:ed by NRC License No. CPPR-66 and to the discussions

of our findings held by Mr. Kellogg with Mr. R. Toole of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

i

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

persnnnel, and observations by the inspector.

Our inspector also verified the steps you reve taken to correct the item

of noncompliance brought to your attention ia a letter dated August 23,

1977. We have no further questicns regarding your action at this time.

Within the scope of this inspection, no items of noncompliance were

observed.

_

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your con-

tractor) believe to be proprietary, it is necessary that you make a

written application within 20 days to this office to withhold 3uch

information from public disclosure.

Any such application must be

accompanied by an affidavit executed by the owner of the infonnation,

which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity

(

oT Yb]

~

79042406~M

h)

s.: c - 3

g

.

.

.

.

2

f40V 2 31977

F.etropolitan Edison Ccmpany

the items which will be considered by the Commission as listed in

The information sought to be

subparagraph (b)(4) of Section 2.790.

withheld shall be incorporated as f ar as possible into a separate

If we do not hear from you in this regard

part of the affidavit.

within the specified period, the report will be placed in the Public

Document Room.

No reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

u -

do

. Brurner, Chief

, adtor Operations and Nuclear

56pport Branch

Office of Inspection and Enforcement Inspection

Enclosure:

Report Number 50-320/77-41

cc w/ encl:

R. L. Wayne, QA Manager, Design & Construction

T. 3 roughton, Safety & Licensing Manager

R. W. Heward, Jr., Project Manager

R. C. Arnold, Vice President, Generation

L. L. Lawyer, Manager, Generation Operations - Nuclear

G. P. Miller, Superintendent

J. L. Seelinger, Unit 2 Superintendent