ML19220A583
| ML19220A583 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 11/22/1972 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML17195A468 | List: |
| References | |
| 50-320-72-07, 50-320-72-7, NUDOCS 7904230128 | |
| Download: ML19220A583 (1) | |
Text
-
S i.
I I
_E.; CLOSURE j
.}
Description of Violations _
9 I
i Metropolitan Edison Ccepany Docket 1;o. 50-320 License !;c. C??R-66 f
ce with Certain activities under your li:ense appear to be in noncon orcan i Report (PSAR) and i
corrittents made in your Freli=inary Saf ety Analys s Appendix E to 10 CFR 50 as indicated below:
"To ensure PSAR Volume 2, Appendix 3D, Section 2.2.3.2 states in part,ill be taintained I
the integrity of all splices, the QC procedure v 1.
visual inspection of each co:pleted connection.
building Centrary to the above several Cadweld splices on the containment l.
These splices exterior all were recorded as accepted by quality controacceptan i
vere found not to meet control procedures.
" Measures shall Criterion VI of Appendix B, 10 CFR 50 states in part, documents are review 2.
be established to assure that 72, Contrary to the above, approved procedure QC-1-2, dated July 12 lifications.
contains contradictory requirenents for Cadweld operator qua 1
1
?
t i
i 9
0 t
l tb-p :. -J :, b l
Y f& D t _}}