Forwards 750305 Memo Re Upcoming OL Stage Review.Acceptance Review Info Scheduled for Submittal by 750328
ML19220A562
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/10/1975
From: Ballard R
Office of Nuclear Reactor Regulation
To: Berkson H, Kline J, Samworth R
Office of Nuclear Reactor Regulation
Shared Package
ML19220A563 List:
References
NUDOCS 7904230070
Download: ML19220A562 (1)


Text

a

.l a t

~ s, >

g

,.a, 4.-

s*

t g

A if DISTRIBUTION Docket File # 50-320 /

RR : Rd g ES3:Rdg Harold Berksen Jerry (,line Echart Erc crth p r ;.,,-

.,-,,,....7..,u

...7.,-

x. "- **n..*'.

'r.c.. -.m.

-:.O 7

rr a

-.., x. x

w...

v.

~.

..., u The enclosed n:20randu: descrites an upccring OL-Cta a reviz for 3rce Mile Island tinich is self-c:qlanatory.

'7e are scheduled to parform an acceptance recict and subnit the specified infor.ation to E2 by I'.crch 23, 1973.

R. Sa.torth is assign 2d lead reeponsibility in assenbling incuts and

reparing a transmittal nanorandum.

Ronald L. 3allard, C 11ef 2nviro: nantal Specialists Branch Division of Technic.11 Review Office or luclecr 'lenctor :'egulation n

,une ccura:

reso dtd 3/5/75 i,

t t,.

."t

/

]' 90 130070 A

k q tf

~

c"">

TR:ES3.

(35 352 R.L. 3allar: l:nr

.,.sacy 3/10/75

=rt>

I',.

.G C-) ! a :. ev. ')-5 3 ).41 C.! 6 : 4 3 W s. s. 2 aw r u = rar i a m?ns cr oc as e 4.

e s s m.

-n

. - ~ _ __

-... ~. -.,

>.e

Or#FAL O

Q

,4 UNITED STATES NUCLEAR REGULATORY COMMissiLN W ASHIN G T ON. D.

C.

20555 Docket No. 50-320 N

R. Ballard, Chief, Environmental Specialist Branch, RL Benaroya, Chief, Effluent Treatment Systems Branch, RL W. Gammill, Chief, Site Anelys'is Branch, RL B. Grimes, Chief, Accident Analysis Branch, RL J. Kastner, Chief, Radiological Assessment Branch, RL M. Spangler, Chief, Cos t/Senafit Analysis Branch, RL METROPOLITAN EDISON CO. (MET-20) THREE MILE ISLAND 2 (mI-2)

Three Mile Island 1 and 2 was one of the first stations reviewed under NEPA in 1971-72.

At that time, the policy was to write the statements for both continuation of construction and operation.

Accordingly, the FES CL stage for TMI 1 and 2 was issued in December 1972.

At the time the FES was issued, no intervenors were involved in TMI-2, no OL hearing was envisioneo, and the unit was scheduled to go into comercial operation in l'ay of 1975.

In the interim, the situation has changed considerably.

The currently scheduled operational date is May 1978, there are now intervenors, and so an CL nearing will be held.

Under these circumstances, CELD recommended, and DRL concurred, that the FES for TMI-2 be updated, circulated in draf t fom, and reissued.

To this end, the applicant was requested to update it's ER, origirally submitted in 1971, to include information currently required by Reg Guide 4.2.

On February 28, 1975 the Metropolitan Edison Company, in support of their application for an operating license for TMI-2, submitted Supplement II to the Environmental Report.

_e the Supplement II c'

references frequently the original ER ue have requested Frank Logan to redistribute copies cf the ER to all reviewing branches.

You are requested to review that portion of the Supplement II in con -

junction with the Environmental Report, distributed separately, which is within your area of interest.

The review should be based on the Regulatory Guide 4.2 Preparation of Environmental Reports for Nuclear Power Plants (not Revision 1 issued January 1975).

Please provide the following information:

a.

Determine whether the Supolement II in conjunction with the Environmental Rasort contains sufficient infor a tion for tha staff to prepare a draf t environ ental statament.

Notureo,o

,. c.. n rg q

7 g

cJ 7

a, &

U

.\\(.,/

WO423^m([

[

i..

()

s r

4se

.m

.P 5 2

b.

The revie.- ers opinion as to the saricusness of tha identified deficiencies, c.

The reviewers estinate of how long it may take a cooperative applicant to ci>tain the missing information.

d.

If the revie.1 can start and procced if the missing infomation is supplied before or during the first envircrd:antal site visit.

Any dafici.c.cies in ::e 9270rt s:1ould ha cc:runicated to Jan :: orris, t.12 Envircr:2ntal Project I':nacar assigr.cd to this plant, as aarly as passible. A telephone raspanse, folloued by a short cecorandum, is satisfactory.

It is planc.ed to tndle the preparatica of tha ES in the sara,tay as other OL revicas have been ccaducted rc.cantly; i.e., cci.:pletely in-hause.

In ordar to maintain the acceptanca reviea schadule, the results of yaur raview are needed on or before 'tarch 28, 1975.

h 3G"> Jf-Or:;i,.ai I:- :..

ib. H. Rcgan, Jr., Chief Envircrcental Projects Cranch 4 Divisica of Reactor Liccasing m;-

'7 F'/L-RL:$P'\\ g4bRL : E P - 4'.....

cr"c=*

s.

, u m - e >-

JN:o rris :aj.

UH Reg'an.

3/4/75 - -

3/5 /75 m,c>

na.CC25 cv. S-5 3).u.C1 c:0

'r u. s. 2:v r a s w e r r ar iriwa ce rters s er4 eze.t es r-----------

,__