Forwards IE Insp Rept 50-320/77-31 on 770729-0801.No Noncompliance Noted
ML19220A493
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/15/1977
From: Nelson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Herbein J
METROPOLITAN EDISON CO.
Shared Package
ML19220A494 List:
References
NUDOCS 7904230025
Download: ML19220A493 (2)


See also: IR 05000320/1977031

Text

..

.,

(fN TM f lL f5

g.N

U'J IT E D ST AT ES

,

l ,,

,t

NUCLEAR REGULATORY COMMtsslON

,

. C MI

REGION I

l

  • 1$

f

6 31 P A R A AVENUC

, 4, , [

J

KING OF PR US$1 A. PENN SYL.V ANI A 19406

' ' . . . . . '

Docket No. 50-320

Metropolitan Edison Company

ATTH: Mr. J. G. Herbein

Vice President

P. O. Box 542

Reading, Pennsylvania. 19603

Gentlemen:

Subject:

Inspection 50-320/77-31

This refers to the inspection conducted by Mr. K. Plumlee of this office

on July 29 and August 1,1977, at the Three Mile Island Nuclear Generat-

ing Station, of activities authorized by NRC l.icense No. CPPR-66, and to

the discussions of our findings held by Mr. Plumlee with Mr. J. Hilbish

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

,

letter. Within these areas, the inspection consisted of selectivt

examinations of procedures and representative records, interviews with

personnel, measurements made by the inspector, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part

2, Title 10, Cada of Federal Regulations, a copy of this letter and the

enclosures will be placed in the NRC's Public Document Room.

If this

report contains anj information tnat you (or your contractor) believe to

be proprietary, it is necessary that you make a written application

.

within 20 days to this office to withhold such information from public

disclosure. Any such application must be accompanied by an affidavit

-

executed by the owner of the infonnation, which identifies the document.

or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by

the Commission as listed in subparagraph (b) (4) of Section 2.790.

The

infonnation sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in

-

-

the Public Document Room.

.

L

.

-

.

D d23 c o a f g c-o

ggigg

)

[jf

-

. . . . _ _ _ . - - . . - . -

.

.

Metropolitan Edison Company

2

AUG 151977

No reply to this letter is required; however, should you have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

,j

A-

Paul R. Nelson, Chief

Fue.1 Facility and Materials Safety

Branch

Enclosure: Office of Inspection and Enforcement

Inspection Report Numoer 50-320/77-31

cc w/ encl:

R. L. Wayne, QA Panager, Design & Construction

T. M. Crimins, Jr., Safety & Licensing Manager

R. W. Hes.ard, Jr., Project Manager

R. C. Arnold, Vice President, Design & Construction

L. L. Lawyer, Manager, Generation Operations - Nuclear

'

G. P. Miller, Superintendent

J. L. Seelinger, Unit 2 Superintendent

Gerald Charnoff, Esquire

Miss Mary V. Southard, Chairman, Citizens for a Safe Environment

(Without Report)

.

.