Urges Firm Maint of Schedule for Implementation of All Mods Associated W/General Design Criterion 3 Re Fire Protection. Requests That Any Outstanding Info Re Open Items & Required Design Details Be Submitted on Expedited Basis
ML19212A258
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 08/10/1979
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Linder F
DAIRYLAND POWER COOPERATIVE
References
NUDOCS 7909170044
Download: ML19212A258 (3)


Text

-)Dbh E 3 g( [o

+

UNITED STATES g

g NUCLEAR REGULATORY COMMISSION g

wAsmucros. o. c. 20sss g%,/

August 10, 1979 Docket No. 50-409 Mr. Frank Linder General. Manager Dairyland Power Cooperative 2615 East Avenue South La Crosse, Wisconsin 54601.

Dear Mr. Linder:

In May 1976, we issued guidelines reflecting the NRC's policy regarding the implementation of General Design Criterion 3 - Fire Protection.

Since that time, you have performed a fire hazards analysis for your facility and have compared its fire protection program with the NRC guidelines.

In late 1976, we set October 1980 as the date for completing the imple-mentation of all modifications associated with this program. This implementation schedule recognized that such modifications should be completed as soon as practical, with due consideration of the nature of the modifications.

For example, minor modifications, adoption of administrative controls and additional portable equip-ment would be completed within six months; however, major modifications would require a y. ear or more to complete and some modifications would be coordinated with refueling outages.

By their Memorandum and Order in the matter of the Union of Concerned Scientists' Petition for Emergency and Remedial Action, dated April 13, 1978, the Commission directed the staff to use their best efforts to maintain this schedule, and also directed that the Commission be advised if any slippage is anticipated, along with suggested corrective actions.

We urge you to apply your best efforts to maintain your schedules for completion of all of the fire protection modifications at your facility (ies) and to submit, on an expedited basis, any infomation that is still outstanding with regard to open items and required design details.

Sincerely,

/

O//

IL.aw<h,b6 j78D. Eisenhut, Acting Director

-@,j Division of Opera:ing Reactors

!/

Office of Nuclear Reactor Regulation

/

q es1.u n gggiq0DN

Mr. Frank Linder August 10, 1979 cc Fritz Schubert, Esquire Staff Attorney Dairyland Power Cooperative 2615 East Avenue South La Crosse, Wisconsin 54601

0. S. Heistand, Jr., Esquire Morgan, Lewis & Bockius 1800,M Street, N. W.

Washington, D. C.

20036 Mr. R. E. Shimshak La Crosse Boiling Water Reactor Dairyland Power Cooperative P. O. Box 135 Genoa, Wisconsin 54632 Coulee Region Energy Coalition.

ATTN:

George R. Nygaard P. O. Box 1583 La Crosse, Wisconsin 54601 La Crosse Public Library 800 Main Street La Crosse, Wisconsin.54601 O