ML19211D193

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-327/79-68 & 50-328/79-32 on 791114-16.No Noncompliance Noted
ML19211D193
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/30/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19211D194 List:
References
NUDOCS 8001170018
Download: ML19211D193 (2)


See also: IR 05000327/1979068

Text

b

e

e nsou

,(

,o,,

UNITED STATES

g,g7

NUCLEAR REGULATORY COMMISSION

e

n

$

3M7 ,E

REGION 11

N,

.t

'#

101 MARIETTA ST., N.W., SUITE 3100

%/

ATLANTA, GEORGIA 303o3

NOV 3 01979

In Reply Refer To:

RII:PKV

50-327/79-68

50-328/79-32

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by P. K. Van Doorn of this office on

November 14-16, 1979 of activities authorized by NRC Construction Permit Numbers

CPPR-72 and CPPR-73 for the Sequoyah Nuclear facility, and to the discussion of

our findings held with G. G. Stack at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room'.

.

.

.

1761

257

'

soounO@

,

K V 3 0 IS79

Tennessee Valley Authority

-2-

i

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

hf 2

<

,

C. E. Murphy, Chi

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-327/79-68

and 50-328/79-32

cc w/ enc 1:

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

J. M. Ballentine

Plant Superintendent

P. O. Box 2000

Daisy, TN 37319

D. L. Lambert, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, TN 37902

E. G. Beasley

Tennessee Valley Authority

309 Grant's Building

Knoxville, Tennessee 37902

1761

258