ML19211D193
| ML19211D193 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 11/30/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19211D194 | List: |
| References | |
| NUDOCS 8001170018 | |
| Download: ML19211D193 (2) | |
See also: IR 05000327/1979068
Text
b
e
e nsou
,(
,o,,
UNITED STATES
g,g7
NUCLEAR REGULATORY COMMISSION
e
n
$
3M7 ,E
REGION 11
N,
.t
'#
101 MARIETTA ST., N.W., SUITE 3100
%/
ATLANTA, GEORGIA 303o3
NOV 3 01979
In Reply Refer To:
RII:PKV
50-327/79-68
50-328/79-32
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by P. K. Van Doorn of this office on
November 14-16, 1979 of activities authorized by NRC Construction Permit Numbers
CPPR-72 and CPPR-73 for the Sequoyah Nuclear facility, and to the discussion of
our findings held with G. G. Stack at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room'.
.
- .
.
1761
257
'
soounO@
,
K V 3 0 IS79
Tennessee Valley Authority
-2-
i
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
hf 2
<
,
C. E. Murphy, Chi
Reactor Construction and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-327/79-68
and 50-328/79-32
cc w/ enc 1:
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
Plant Superintendent
P. O. Box 2000
Daisy, TN 37319
D. L. Lambert, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
J. F. Cox
400 Commerce Street
W10C131 C-K
Knoxville, TN 37902
E. G. Beasley
Tennessee Valley Authority
309 Grant's Building
Knoxville, Tennessee 37902
1761
258