IE Insp Repts 50-546/79-21 & 50-547/79-21 on 791030-31 & 1101.No Noncompliance Noted.Major Areas Inspected: Surveillance of Auxiliary Bldg,Unit 1 & 2 Containments & Miscellaneous Areas to Verify Compliance W/Stop Work Order
ML19211C962
Person / Time
Site: Marble Hill
Issue date: 11/21/1979
From: Harrison J, Williams C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19211C953 List:
References
50-546-79-21-01, 50-546-79-21-1, 50-547-79-21, NUDOCS 8001160059
Download: ML19211C962 (3)


See also: IR 05000546/1979021

Text

.

U.S. NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-546/79-21; 50-547/79-21

Docket No. 50-546; 50-547

License No. CPPR-170; CPPR-171

Licensee:

Public Service of Indiana

1000 East Main Street

Plainfield, IN 46168

Facility Name: Marble Hill Generating Station, Units 1 and 2

Inspection At: Marble Hill Site, Jefferson County, IN

Inspection Conducted: October 30, 31 and November 1, 1979

N

Inspector:

. J. Harrison

O

AI "

(?6? k N'b{c2> w

Approved By:

C. C. Williams, Chief

///~4)/7/

Projects Section 2

'

Inspection on October 30, 31 and November 1, 1979 (Report No. 50-546/79-21;

50-547/79-21)

Areas Inspected: Surveillance of the Auxiliary Building, Unit 1 and Unit 2

Containments, storage areas and miscellaneous areas to verify that activities

in progress complied with the stop work order issued August 7, 1979. The

inspector also met with key PSI and subcontractor personnel to establish

iritial interfaces and contacts. This inspection involved a total of 20

inspector-hours on site by one NRC inspector.

Results: No items of noncompliance or deviations were identified.

1756

124

800116006'I

.

DETAILS

.

Principal Persons Contacted

Public Service of Indiana (PSI)

  • G. Bi r .c

Project Director (MAC)

J, Br. ar, Construction Manager (MAC)

  • B. Turner, QA Manager (MAC)
  • E. Shows, Consultant, (MAC)

J. Frost, Area Manager Turbine Building (MAC)

D. Shuter, Quality Engineer, Civil

G, Weston, Quality Engineer, Mechanical

T. McLarty, Construction Inspection Supervisor

  • J. Jackson, Consultant (MAC)

(MAC), Management Analysis Company

Subcontractors

Newburg-Marble Hill

A. Archer, Project Manager

E. Guy, QA Superintendent

J. Coffman, QC Supervisor

Cherne

J. Mortel, Project Manager

A. Dolgard, QC Manager

Commonwealth - Lord

W. Koon, Project Manager

T. Page, QA Manager

J. Hindson, QA Supervisor

  • Denotes those present at the exit meeting.

Functional or Program Areas Inspected

1.

Construction Activities

Surveillance of construction activities indicated that work in all

Category I areas

i.e.,

safety related work, remains terminated, in

accordance with confirmatory order dated August 15, 1979, except for

the protection of installed or in place components.

1756

125

-2-

.

Key construction specifications were reviewed for content with

special attention directed toward storage and maintenance.

The

inspector reviewed the storage and maintenance of items and major

components installed and/or in storage.

No items of noncompliance or deviations were identified.

Exit Meeting

The inspector met with those persons (denoted in the Persons Contacted

paragraph) at the conclusion of the inspection on November 1,1979. The

inspector summarized the scope and findings of the inspection.

1756

126

-3-