BWns & MOOnnSil Engineers-ArcNtects-Consultants POS' 3 8 5'CE d o w 173 TEL 316 333-4375 TWX 910 7' t 3059
< A.s c.s ci r. vissou Ai mai uco s Asr s3m srmeer January 3, 1980 Directorate of Licensing i.T.S. :!uclear Regulatory Commission Washington DC 20535 Re:
V. C. Summer Nuclear Station Unit 1 South Carolina Electric 2 Gas Ccapan't Service 'Jater Intake Tunnel Settlement Gentlemen:
During my af filiation with Gilbert Associates Inc., Reading, Penns:*1vania, I was involved on the above referenced project and was assigned as a reviewer for the structural integrity evaluation of the tunnel. Partial check of the calculations of tunnel stresses was made by me.
Due to change of my affiliation with the company, the verification of the calculaticas could not be completed.
However, based on my findings, I sent my comments and recctmen-dations to the responsible engineer at Gilbert Associates.
As the tunnel damage due to settlement and subsequent repair was an important engineering experience of learning about structural failures, I am interested to read the final report en tunnel settlement and repair submitted to your office by Gilbert Associates, Inc.
I request you therefore to send me a copy of the report as soon as possible.
Thank you, Sincerely yours,
.e a:..
Balbir S. Sandhu, PE BSS/rb b # Q
\\