SMUD SACRAMENTO MUNICIPAt UTILITY DISTRICT C) 6201 S Street, Box.15830, Sacramen,- CMifornia 95813; (916) 452-3211
-January 7,1980 Mr. R. H. Engelken, Director Region V Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 1990 North California Boulevard Walnut Creek Plaza, Suita 202 Walnut Creek, California 94396 Re: Operating License DPR-54 Docket No. 50-312 Reportable Occurrence 83-2
Dear Mr. Engelken:
Bechtel Corporation notified Rancho Seco that the analysis being conducted according to Bulletin 79-02 showed the seismic support on the Decay Heat Crosstie Line had a safety factor less than 1.0.
Both Decay Heat Systems were technically declared-inoperable and the reactor power was decreased, according to Technical Specifications, to hot shutdown Friday, January 4, 1980.
The unit remained at hot shutdown and repairs to upgrade the support were initiated. The modifications were completed Saturday and passed inspection.
Both systems were declared operable and the unit was returned to power operation January 5,1980.
The unit is at 90% power and will return to 100% power'today.
A complete report will be submitted to your office within 14 days.
Ies et ilqy submitted,
( \\s
\\
\\
ky R. J.
todrigucz Ma. nager, -Nucle,ir Operations RJR: RWC: jim cs: Director, MIPC (3) 742 081 Director, I&E (30) 800111c
&Y AN ELECTRIC JYSTEM 5 E R v i '4 G MOEL THAN 600,000 8.
HE HEARI of catita Ni,