ML19211C287

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-070/79-02 on 791023-24.No Noncompliance Noted
ML19211C287
Person / Time
Site: Vallecitos File:GEH Hitachi icon.png
Issue date: 11/21/1979
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Darmitzel R
GENERAL ELECTRIC CO.
Shared Package
ML19211C288 List:
References
NUDOCS 8001110170
Download: ML19211C287 (2)


See also: IR 05000070/1979002

Text

gn nroy,

'

..

o

UNITED STATES

(p

8' }* ) .f.q ' gg

NUCLEAR REGULATORY COMMISSION

.4. '

, ,; E

REGION V

1990 N. CALIFORNIA BOULEVARD

o, -

'd"g

' b#

SulTE 202, WALNUT CREEK PLAZA

e,,,e

WALNUT CREE K, CALIFORNI A 94596

tiovember 21, 1979

Docket No. 50-70

General Electric Company

Vallecitos Nuclear Center

P. O. Box 460

Pleasanton, California 94566

Attention: Mr. R. W. Darmitzel, Manager

Irradiation Processing Operation

Gentlemen:

Subject: NRC Inspection of GETR Facility

This refers to the inspection conducted by Mr. G. B. Zwetzig of this

office on October 23-24, 1979 of activities authorized by NRC License

No. TR-1, and to the discussion of our findings held by Mr. Zwetzig with

Mr. D. Gilliland and other members of your staff at the conclusion of

the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and represent. .tve records, inter-

views with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The applica-

tion must include a full statement of the reasons why it is claimed that

the information is proprietary. The application should be prepared so

1740 271

8 001110 J70

9

s

.

General Electric Company

-2-

November 21, 1979

that any proprietary information identified is contained in an enclosure

to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely.

p. / ,

,D 3l y , na da.

a~

3

,

'

60 J. L. Crews, Chief

Reactor Operations 'and

Nuclear Support Branch

Enclosure:

IE Inspection Report

No. 50-70/79-02

cc w/o enclosure:

William A. Smith, Manager

Nuclear Safety and Quality Assurance, GE

D. L. Gilliland, Manager

Reactor Irradiations, GE

1740 272