ML19211C226

From kanterella
Jump to navigation Jump to search
Ack Receipt of 791207 Final Deficiency Rept Re S&M Constructors,Inc Control of Subcontractor Halvorsen Boiler & Engineering Co.Review Will Be Completed During Future Insp
ML19211C226
Person / Time
Site: Perry  
Issue date: 12/19/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 8001110080
Download: ML19211C226 (1)


Text

T\\C p* 880 UNITED STATES

+i 0s,[*g NUCLEAR REGULATORY COMMISSION g

o REGloN 111 3

f 799 ROOSEVELT ROAD

[

OLEN ELLYN, ILLINOIS 60137 DEC ' " $79 Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: Dalwyn R. Davidson Vice President - System Engineering and Construction Post office Box 5000 Cleveland, OH 44101 Gentlemen:

Thank you for your final report dated December 7, 1979, pursuant to 10 CFR 50.55(e) regarding S&M Constructors, Incorporated control of their subcontractor, Halvorsen Boiler and Engineering Company. We will complete our review of this matter during a future inspection.

Your cooperation with us appreciated.

Sincerely, t

  • Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch cc: Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting A't0 iil Commission Mr. Daniel D. Wilt, Attorney 8 0 011100 f(O