ML19211C171

From kanterella
Jump to navigation Jump to search
Ack Receipt of 791207 Interim Rept Re Closure Springs for Fire Dampers Installed in Reactor Bldg Heating,Ventilation & Air Conditioning Sys.Requests That Completion of Final Rept Be Expedited
ML19211C171
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/19/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
References
NUDOCS 8001110022
Download: ML19211C171 (1)


Text

p* "'%g UNITED STATES

_ f, NUCLEAR REGULATORY COMMISSION g

g o

R E GloN 111 5

'j 799 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS 50137 DEC I S 1979 isocket No. 50-341 The Detroit Edison Company ATTN:

Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, Michigan 48226 Gentlemen:

Thank you for your interim report dated December 7,1979, pursuant to 10 CFR 50.55(e) regarding closure Springs for Fire Dampers installed in the Reactor Building HVAC System at the Fermi 2 Site.

It is requested that you expedite your final report so that we may complete our review of this matter in a timely manner. We will review your final report on this matter upon receipt.

Your cooperation with us is appreciated.

Sincerely,

'S &

Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch cc:

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public

)[30

}h7 Service Commission Eugene B. Thomas, Jr.,

Attorney 8001 0022