ML19211C154

From kanterella
Jump to navigation Jump to search
Forwards Approved Task Action Plan A-42, Pipe Cracks in Bwrs. Activity Expected to Be Completed During 1979
ML19211C154
Person / Time
Issue date: 07/30/1979
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Case E
Office of Nuclear Reactor Regulation
Shared Package
ML19211C153 List:
References
REF-GTECI-A-42, REF-GTECI-PI, TASK-A-42, TASK-OR NUDOCS 8001100282
Download: ML19211C154 (1)


Text

.

,/

'o,,

UNITED STATES NUCLEAR REGULATORY COMMISSION 3

g

E WASHINGTON. D. C. 20555

/

AL 3 01979 MEMORANDUM FOR:

E. G. Case, Chairman Technical "

'vities Steering Committee FROM:

D. G. Eisenhut, Acting Director Division of Operating Reactors

SUBJECT:

TASK ACTION PLAN A-42, " PIPE CRACKS IN B0ILIllG WATER REACTORS" Enclosed for your information is the approveJ Task Action Plan A-42,

" Pipe Cracks in Boiling Water Reactors." This activity is expected to be completed this year.

/

i k

h D. G. Eisenhut, Acting Director Division of Operating Reactors

Enclosure:

As stated

Contact:

C. Y. Cheng3 D0R 49-28033 cc:

F. Schroeder D. Muller D. Vassallo S. Hanauer M. Aycock J. Knight L. Shao V. floonan S. Pawlicki R. Gamble W. Hazelton B. Turovlin C. Cheng 1737 012 Mb 80 011 00