U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION IV Report No.
99900063/79-02 Program 51300 Company:
Pacific Pump Division 7515 Bickett Street Huntington Park, California 90255 Inspection Conducted: October 1-5, 197 t/
Inspector:
H. W. RQh.drds, Contr/ct6r Inspector Date ComponentsSection II Vendor Inspection Branch Approved by:
X V
D. M @ nnicutt, Chiff/~
Date Components Section FI Vendor Inspection Branch Summary Inspection on October 1-5, 1979 (99900063/79-02)
Areas Inspected:
Implementation of 10 CFR 50, Appendix B, criteria and applicable codes and standards including actions on previous inspection findings, welding material control, control of welding, and equipment calibration.
The inspection involved twenty-eight (28) inspector-hours on site by one (1) NRC inspector.
Results:
In the four (4) areas inspected, no apparent deviations or unresolved items were identified in two (2) areas; the following deviations being identified in the remaining areas.
Deviations: Welding Material Control - 5/32 and 3/16 coated electrodes were mixed in one compartment in a holding oven (Notice of Deviation, Item A).
Control of Welding - Welding had been accomplished although the Summary of Processes which defines the welding procedure had not been released (Notice of Deviation, Item B).
1739 086 800110007 [
i i
2 DETAILS SECTION A.
Persons Contacted
- D. J. Moyer, Quality Assurance Manager S. R. Grajenda, Welding Engineer D. Ausman, Welding General Foreman B. Thomas, Welder
- Denotes tLase attending the exit meeting.
B.
Acticas on Previous Inspection Findings (Closed) Deviation (Inspection Report No. 79-02, Item A of Enclosure):
1.
Welding was being performed outside the current and voltage range of the approved weld procedure specification.
The inspector verified that weld procedure specification No. 042-2-5780 had been revised to include the current and voltage range that was being used for welding on Order No. 50090, Item B02, and had been approved by the customer.
(Close~d) Deviation (Inspection Report No. 79-01, Item B of Enclosure):
2.
Distribution of weld procedure addendums not consistent with NRC and Code requirements.
The inspector verified that a closed loop record system had been initiated in the form of a document distribution transmittal sheet and a review of the Summary of Processes (SP) document and assigned procedure manuals did not reveal a similar discrepancy.
C.
Weldinz Material Control 1.
Objectives The objectives of this area of the inspection were to verify that measures are established to control the purchasing, storage, handling and issuance of weld materials in accordance with the manufacturer's QA program and applicable ASME Code and NRC requirements.
2.
Method of Accomplishment The preceding objectives were accomplished by:
Review of Chapter 7 of the Quality Assurance Manual, dated a.
July 12, 1978.
]739 087
3 b.
Review of Procedure for the Issuance and Control of Welding Materials No. 112-1-0001-3, dated February 9,1979.
Inspection of the weld material crib area and three (3) holding c.
ovens Nos. 8, 11, and 12.
d.
Inspection one (1) portable oven containing coated electrode.
Review of four (4) purchase orders of weld material.
e.
f.
Review of Qualified Organizat' ' List, dated July 15, 1979.
3.
Findings a.
Deviations from Commitments l
See Enclosure, Item A.
I b.
Unresolved Items None.
D.
Control of Welding 1.
Objectives The objectives of this area of the inspection were to verify that:
Weld operations are accomplished in accordance with qualified a.
procedures and/or technique sheets.
b.
Weld procedure and/or instructions are available in the area g
where the weld operation is performed.
I Welding is accomplished by qualified personnel and qualifications c.
j are current for welding process used.
2.
Method of Accomplishment The preceding objectives were accomplished by:
i Review of the Quality Assurance Manual, Chapters 5 and 7, dated a.
July 12, 1978.
b.
Review of four (4) weld procedure specifications and applicable procedure qualification records.
1739 ODBB
4 c.
Observation of welding performed on Order No. B49790, Item D07A for compliance to the applicable WPS.
d.
Review of records of welder, qualification for operations observed.
e.
Verification of calibration status of equipment when required in the calibration program.
3.
Findings a.
Deviations from Commitments See Notice of Deviation, Item B.
b.
Unresolved Items None.
E.
Equipment Calibration 1.
Objectives _
The objectives of this area of the inspection were to verify that a system has been established and is maintained to assure that tools, gauges, instruments and other measuring devices used in activities affecting quality are properly controlled, calibrated and adjusted at specified periods to maintain accuracy within required limits.
2.
Method of Accomplishment The preceding objectives were accomplished by:
Review of the Quality Assurance Manual, Chapter 11 dated a.
July 12, 1978.
b.
Review of Procedure number 117-1-001 i
c.
Observation of eleven (11) OD micrometers, six (6) ID micro-j meters, and six (6) thread gauges for identification and current calibration stickers.
l d.
Review of twelve (12) calibration record cards for micro-meters and thread gauges.
3.
Findings Within this area of the inspection, no deviations from commitments or unresolved items were identified.
1739 089 i
5 F.
Exit Meeting An exit meeting was held by the inspector on October 5,1979, with the following management and Authorized Inspection Agency representatives present:
D. B. Harney, President D. J. Moyer, Quality Assurance Manager J. C. Patton, General Mfg. Manager C. k'eisman, Inspection Specialist State of California A. Herrington, ANI State or California The inspector summarized the scope of the inspection and the findings.
Management acknowledged the statements of the inspector and had no specific questions in regard to the findings as presented to them.