Nov is v3h State of Illinois Department of Public Health ATTN:
Mr. Gary N. Wright, Chief Division of Nuclear Safety 535 West Jefferson Street Springfield, IL 62761 Gentlemen:
The enclosed IE Information Notice No. 79-27 titled " Steam Generator Tube Ruptures At Two PWR Plants" was sent to the following licensees on November 16, 1979:
American Electric Power Service Corporation Indiana and Michigan Power Company D. C. Cook 1, 2 (50-315, 50-316)
Cincinnati Gas & Electric Company Zimmer (50-358)
Cleveland Electric Illuminating Company Perry 1, 2 (50-440, 50-441)
Commonwealth Edison Company Braidwood 1, 2 (50-456, 50-457)
Byron 1, 2 (50-454, 50-455)
Dresden 1, 2, 3 (50-10, 50-237, 50-249)
La Salle 1, 2 (50-373, 50-374)
Quad-Cities 1, 2 (50-254, 50-265)
Zion 1, 2 (50-295, 50-304)
Consumers Power Company Big Rock Point (50-155)
Midland 1, 2 (50-329, 50-330)
Palisades (50-255)
Dairyland Power Cooperative 1f7g n77 LACBWR (50-409)
I/>/
U//
Detroit Edison Company Fermi 2 (50-341)
Illinois Power Company Clinton 1, 2 (50-461, 50-462) 8001100 C)Eh
9 State of Illinois '--
Iowa Electric Light & Power Company Duane Arnold (50-331)
Northern Indiana Public Service Company Bailly (50-367)
Northern States Power Company Monticello (50-263)
Prairie Island 1, 2 (50-282, 50-306)
Ohio Edison Company Erie 1, 2 (50-580, 50-581)
Public Service of Indiana Marble Hill 1, 2 (50-546, 50-547)
Toledo Edison Company Davis-Besse 1 (50-346)
Union Electric Company Callaway 1, 2 (50-483, 50-486)
Wisconsin Electric Power Company Point Beach 1, 2 (50-266, 50-301)
Wisconsin Public Service Corporation Kewaunee (50-305)
Sincerely, dilLYkN t
len Pa s, Chief
/s
~Administ ative Branch
Enclosures:
1.
IE Information Notice No. 79-27 2.
Recently Issued IE Information Notices cc w/encls:
Mr. D. W. Kane, Sargent & Lundy 177O G7O Central Files I/J/
UI U Reproduction Unit NRC 20b Local PDR NSIC TIC
SSINS No.:
6870 Accession No.
7910250488 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON D.C.
20555 November 16, 1979 IE Information Notice No. 79-27 STEAM GENERATOR TUBE RUPTURES AT TWO PWR PLANTS Description of Circumstances:
In recent months two incidents involving steam generator tube ruptures riave occurred.
In both instances, the units were cooled down and placed in the residual heat removal mode with existing procedures.
Event of June 25, 1979 at the Doel 2 Nuclear Power Plant in Belgium The first event occurred on June 25, 1979, at the Doel 2 nuclear power plant in Belgium.
The Doel unit is a 390 Mwe Westinghouse two-loop reactor.
The event consisted of a rupture of several tubes in the loop B steam generator.
The resultant leakage between the primary and secondary systems was estimated to be 125 gpm.
The event started when the plant was heated up after a shutdown caused by a malfunction of the main steam isolation valve.
At the time of the incident the primary coolant pressure was:
2233 psi and the temperature:
491 F.
The reactor remained subtritical throughout the event.
The first indication of abnormal behavior was a rapid decrease of the primary system pressure (approximately:
28 psi / min.).
This was followed by the sequence of events listed below:
1739 079 Time mia-1.
Increase of charging flow demand, requiring startup of a second 1.8 charging pump.
2.
Automatic isolation of the CVCS 1 3.
Shutoffofthepressurizerheaterg DUPLICATE DOCUMENT pressurizer.
3 Entire document previously entered 'nto system under:
ANO N o. of pages:
[h