ML19211A837

From kanterella
Jump to navigation Jump to search
Forwards Final Version of Fire Qualification Test on Silicone Foam Floor Penetrating Seals
ML19211A837
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 12/14/1979
From: Parker W
DUKE POWER CO.
To: Baer R
Office of Nuclear Reactor Regulation
Shared Package
ML19211A838 List:
References
NUDOCS 7912210171
Download: ML19211A837 (1)


Text

.*

DUKE POWER COMPANY Powen Buu.omo 422 Soutu Curucu Starer, CHAHwTTE, N. C. ana4a WI L LI A M O. PAR K E R, J R, Vic F Patst Df MT TE L E PMC N E' apt A 704 STEa Paoovction 3 7 3-4 0e 3 December 14, 1979 Mr. Ilarold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Mr. Robert L. Baer, Chief Light-Water Reactor Branch No. 2 Re: McGuire Nuclear Station Units 1 and 2 Docket Nos. 50-369, -370

Dear Mr. Denton:

In a letter dated November 2, 1978, responses to NRC staff positions on fire protection (transmitted by the staff's letter of September 6, 1978) were submitted. This letter included a draft copy of the test report on penetrations through fire barriers along with a commitment to provide the final report when completed. Attached are three copies of the final version of this test report entitled, " Fire Qualificatica Test on Silicone foam Floor Penetration Seals."

The staff has accepted this matter based on review of the draft report and documented their review in Supplement 2 to the McGuire Safety Evaluation Report. There are no significant differences between the draft report and this final report.

Very truly yours, 2fu William O. Parker, Jr.

////) /-/-

GAC:vr Attachment kPRoGg 4

i i

1635 356 Y:

th f Anniversary

    • oweR I M2210 g]