ML19211A837
| ML19211A837 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 12/14/1979 |
| From: | Parker W DUKE POWER CO. |
| To: | Baer R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19211A838 | List: |
| References | |
| NUDOCS 7912210171 | |
| Download: ML19211A837 (1) | |
Text
.*
DUKE POWER COMPANY Powen Buu.omo 422 Soutu Curucu Starer, CHAHwTTE, N. C. ana4a WI L LI A M O. PAR K E R, J R, Vic F Patst Df MT TE L E PMC N E' apt A 704 STEa Paoovction 3 7 3-4 0e 3 December 14, 1979 Mr. Ilarold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Mr. Robert L. Baer, Chief Light-Water Reactor Branch No. 2 Re: McGuire Nuclear Station Units 1 and 2 Docket Nos. 50-369, -370
Dear Mr. Denton:
In a letter dated November 2, 1978, responses to NRC staff positions on fire protection (transmitted by the staff's letter of September 6, 1978) were submitted. This letter included a draft copy of the test report on penetrations through fire barriers along with a commitment to provide the final report when completed. Attached are three copies of the final version of this test report entitled, " Fire Qualificatica Test on Silicone foam Floor Penetration Seals."
The staff has accepted this matter based on review of the draft report and documented their review in Supplement 2 to the McGuire Safety Evaluation Report. There are no significant differences between the draft report and this final report.
Very truly yours, 2fu William O. Parker, Jr.
////) /-/-
GAC:vr Attachment kPRoGg 4
i i
1635 356 Y:
th f Anniversary
- oweR I M2210 g]