ML19211A720

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-423/79-08 on 790924-26.No Noncompliance Noted
ML19211A720
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/26/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST UTILITIES
Shared Package
ML19211A721 List:
References
NUDOCS 7912200521
Download: ML19211A720 (2)


See also: IR 05000423/1979008

Text

ha necg

WM NM

'

o,

UNITED STATES

8 } )eh.' j

NUCLEAR REGULATORY COMMISSION

3 ?

I

REGION 1

8

0,

631 PARK AVENUE

8

%,

'd

,o

KING oF PRUSSIA, PENNSYLVANIA 1940G

.....

Docket No. 50--423

OCT 2 8 IU3

Northeast Nuclear Energy Company

ATTN:

Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection No. 50-423/79-08

This refers to the inspection conducted by W. F. Sanders of this office on

September 24-26, 1979 at the Millstone Nuclear Power Station, Unit 3, at

Waterford, Connecticut of activities authorized by NRC License No. CPPR-ll3

and to the discussions of our findings held by W. F. Sanders with J. O'Brien

of your staff at the conclusion of the inspection.

Areas examined during this inspc tion are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative recoras, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure.

Any

such application must be accompanied by an affidavit executed by the owner of

the information, which identifies the document or part sought to be withheld,

and which contains a statement of reasons which addresses with specificity the

items which will be considered by the Commission as listed in subparagraph (b)

(4) of Section 2.790.

The information sought to be withheld shall be incorpo-

rated as far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report will be

placed in the Public Document Room.

1631

102

7 912200 5 2/

9

-

.

,

Northeast Nuclear Energy Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

C

/o ert

V.c,/

=

R

. Carlson,7hief

Reactor Construction and Engineering

Support Branch

Enclosure:

Office of Inspection and Enforcement

Inspection Report No. 50-423/79-08

cc w/ encl:

K. W. Gray, Construction Quality Assurance Lead

H. R. Nims, Director of Nuclear Projects

J. F. Opeka, Station Superintendent

J. R. Himmelwright, Licensing Safeguards Engineer

1631

103