ha necg
WM NM
'
o,
UNITED STATES
8 } )eh.' j
NUCLEAR REGULATORY COMMISSION
3 ?
I
REGION 1
8
0,
631 PARK AVENUE
8
%,
'd
,o
KING oF PRUSSIA, PENNSYLVANIA 1940G
.....
Docket No. 50--423
OCT 2 8 IU3
Northeast Nuclear Energy Company
ATTN:
Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection No. 50-423/79-08
This refers to the inspection conducted by W. F. Sanders of this office on
September 24-26, 1979 at the Millstone Nuclear Power Station, Unit 3, at
Waterford, Connecticut of activities authorized by NRC License No. CPPR-ll3
and to the discussions of our findings held by W. F. Sanders with J. O'Brien
of your staff at the conclusion of the inspection.
Areas examined during this inspc tion are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative recoras, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure.
Any
such application must be accompanied by an affidavit executed by the owner of
the information, which identifies the document or part sought to be withheld,
and which contains a statement of reasons which addresses with specificity the
items which will be considered by the Commission as listed in subparagraph (b)
(4) of Section 2.790.
The information sought to be withheld shall be incorpo-
rated as far as possible into a separate part of the affidavit.
If we do not
hear from you in this regard within the specified period, the report will be
placed in the Public Document Room.
1631
102
7 912200 5 2/
9
-
.
,
Northeast Nuclear Energy Company
2
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
C
/o ert
V.c,/
=
R
. Carlson,7hief
Reactor Construction and Engineering
Support Branch
Enclosure:
Office of Inspection and Enforcement
Inspection Report No. 50-423/79-08
cc w/ encl:
K. W. Gray, Construction Quality Assurance Lead
H. R. Nims, Director of Nuclear Projects
J. F. Opeka, Station Superintendent
J. R. Himmelwright, Licensing Safeguards Engineer
1631