ML19211A379

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-327/79-56 on 790901-30.No Noncompliance Noted
ML19211A379
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 11/07/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19211A380 List:
References
NUDOCS 7912180125
Download: ML19211A379 (2)


See also: IR 05000327/1979056

Text

f/C

.

,,,

&sw

o

UNITED STATES

'

g

8

NUCLEAR REGULATORY COMMISSION

<,

$

E

REGION 11

\\*****o#

~

101 MARIETTA ST., N.W., SUITE 3100

ATI,ANTA, GEORGIA 3o3o3

NOV 0 71979

In Reply Refer To:

RII:WIC

50-327/79-56

Tennessee Valley Authority

Atta:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, Tennessee 37401

Gentlemen:

This refers to the inspection conducted by W. T. Cottle of this office on

September 1-30, 1979 of activities authorized by NRC Construction Permit No.

CPPR-72 for the Sequoyah Nuclear Plant facility, and to the discussion of our

findings held with J. M. Ballentine at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

'

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

,

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

1597

302

7912180

.

NOV 0 71974

Tennessee Valley Authority

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

l

p:-

l-L

)

<

R. C. Lewis, Chief

Reactor Operations and

Nuclear Support Branch

. Enclosure:

Inspection Report No. 50-327/79-56

cc w/ enclosure:

G. G. Stack, Project Manager

Post Office Box 2000

Daisy, Tennessee 37319

J. M. Ballentine

Plant Superintendent

Post Office Box 2000

Daisy, Tennessee 37319

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, Tennessee 37902

D. L. Lambert, Project Engineer

400 Chestnut Street Tower II

Chattanooga, Tennessee 37401

E. G. Beasley

Tennessee Valley Authority

309 Grant's Building

Knoxville, Tennessee 37902

,