05000346/LER-1979-109-03, /03L-0:on 791113,discovered Couch (Deutsch) Relay Contacts Were Driving High Inductive Loads in 26 Nuclear safety-related Circuits.Caused by Inductive Surge When Contacts Open.Arc Suppression Diodes Added to Circuits

From kanterella
(Redirected from ML19211A275)
Jump to navigation Jump to search
/03L-0:on 791113,discovered Couch (Deutsch) Relay Contacts Were Driving High Inductive Loads in 26 Nuclear safety-related Circuits.Caused by Inductive Surge When Contacts Open.Arc Suppression Diodes Added to Circuits
ML19211A275
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/11/1979
From: Beeler T
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19211A273 List:
References
LER-79-109-03L, LER-79-109-3L, NUDOCS 7912170303
Download: ML19211A275 (2)


LER-1979-109, /03L-0:on 791113,discovered Couch (Deutsch) Relay Contacts Were Driving High Inductive Loads in 26 Nuclear safety-related Circuits.Caused by Inductive Surge When Contacts Open.Arc Suppression Diodes Added to Circuits
Event date:
Report date:
3461979109R03 - NRC Website

text

U.S. NUCLEAR REGULATORY COMMISSION NRC F ORM 36G (770 LICENSEE EVENT REPORT CONTROL BLOCK:

l l

l l

l lh (PLEASE PRINT OR TYPE alt REQUIRED INFORMATION) 1 6

o I u I D 18 I s l 1 l@l 010 l-l 010 lN lP lF l-l0 l 3 l@l4 Il 11 Ii i1 l@l l

I@

o i

7 8 9 LICENSEE CODE 14 IS LICENSE NUMutH 2b 20 LICEN5k TY PE JO 57 CAI bd lolil S$R$lL @l0l5l0l-l0l3l416 @l11111131719 @l1 l2 l1 l1 l7 l9 l@

CON'T bd bJ EVENT DATE 74 75 HEPORT DATE 80 60 61 COCKET NUYllER

?

8 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h

[ l o l 2 ] lDuring work on Facility Change Request (FCR)79-378, which added arc suppression diodet it l l o l a i I o all non-saf ety related reactor coolant pump auxiliary relay interlock circuits, t

loads in 26 l jol4) lvas found that Couch (Deutsch) relay contacts were driving high inductive lol3l lnucicar safety related circuits. Although there has been no failures of these relays l There vad lOlcl l n the Class IE circuits, this finding is being reported under T.S. 6.9.1.9.

i There have Ino danger to the health and safety of the public or station personnel.

o 7 been no relay failures in the nuclear safety related circuits.

(NP-33-79-126)

I o a I t10 SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE Q

lI lE l@ {@ l Al@

R l E l L l A l Y l X ]h l Al@ Q @

7 8

9 10 11 12 f3 18 IJ 20 REVislON SEQUENTI AL OCCURRENCE REPORT EVENT YE AR REPORT NO.

CODE TYPE No.

h n"tf R'RO l7 l9 l l__J l 1l gl 9l kJ 0 3l L

b W

j,PO R 25 21 23 24

.'6 21 28 29 30 s1 32 t

TAKE A TO O PL NT T

HOURS 22

. ITT D FO UB.

SUPPLI MAN FACTU ER IF [gl34Z lg lJ5C lg l36Z l@

l 0] 0l 0] pl gg l Njg l A l@

Cl6l4l9l@

3/

40 41 42 43 44 47 33 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h

_ g lThe cause of the potential Couch (Deutsch) relay failures has been determined to be an l l

l unexpected inductive surge in the circuit when the contacts open which may 3 i

, 7 lcause a shorting of the relay contacts to ground. As a preventative measure, FCR l

y l79-378 Suppler.nt 1 added arc suppression diodes Lo all 26 Class IE circuits.

l

~ L'_Ld_1 1 80 7

8 9 ST US

% POWE R OTHER STATUS ISCOV RY DISCOVERY DESCHIPTION

~

LcJ@ l ol 0101@l NA l

[Dj@l l

i s ACTfVITY CONTENT LOCATION OF RELEASE RELE ASED OF HELEASE AMOUNT OF ACTIVITY tzJ@ uusi NA J

NA i e 80 7

8 9 to 11 44 45 PERSONNEL F xPOSunES NU*.'B E R TYPE

DESCRIPTION

~ L'_DJ 10 010l@lzl@l NA PERSONNE L INJURIES xsCR,P,0Ne 1592 218 l

_.e E.

l0l0l0l@lNA i a 80 7

8 9 11 12 LOSS OF OR DAVAGE To FACILITY l

TYPE D E SCHIP TION

~

y @l NA i o 80 7

8 9 10 Issue @DESCDiPTION lllllllllllll}

l NA

o 68 69 80 g F

8 9 to 419-259-5000, Ext. 253

{

DVR 79-165 PHONE:

NAME OF PnEPARER

TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POUER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-79-126 DATE OF EVENT:

November 13, 1979 FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: Couch (Deutsch) relays were driving high inductive surge levcis in certain nuclear safety related circuits The unit was in Mode 5, with Power (MRT) = 0, and Conditions Prior to Occurrence:

Load (Gross MWE) = 0.

Description of Occurrence: During work on Facility Change Request (FCR)79-378, which added arc suppression diodes to nll non-safety related reactor coolant pump auxiliary relay interlock circuits, it was found that Couch (Deutsch) relay contacts were driving high inductive loads in twenty-six (26) nuclear safety related circuits. Although there have been no failures of these relays in the Class IE circuits, this finding is being reported under Technical Specification 6.9.1.9.

Designation of Apparent Cause of Occurrence: The cause of the potential Couch (Deutsch) relay failures has been determined to be an unexpected inductive surge in the circuit when the contacts open which may cause a shorting of the relay contacts to ground.

The initial design did not anticipate the surge in the Class IE circuits.

Analysis of Occurrence: There was no danger to the health and safety of the public or to station personnel. There has been no relay failures in the nuclear safety related circuits.

Corrective Action

As a preventative measure, FCR 79-378 Supplement 1 added arc sup-pression diodes to all twenty-six (26) Class IE circuits. This further assures the operability of the circuits by providing a path for the discharge of the energy in the coil through the diode rather than through the contacts of the interrupting relay.

Failure Data: There have been no previous relay failures in Class IE circuits due to an inductive surge in the circuits. However, in the non-safety related reactor coolant pump auxiliary relay circuit, there has been a failure; refer to Licensee Event Report NP-33-79-121.

LER #79-109 i592 219 e