ML19210E806
| ML19210E806 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/04/1979 |
| From: | Gossick L NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Rebecca Stone SENATE |
| Shared Package | |
| ML19210E807 | List: |
| References | |
| NUDOCS 7912130014 | |
| Download: ML19210E806 (1) | |
Text
h UNITED STATES 5,
'o,,
[ '<* 3 #, ( 'g NUCLEAR REGULATORY COMMISSION
.: E WASHINGTON, D. C. 20555
)
5.g,
&f'
. j f
OCT 4 1979 Docket No. 50-302 The Honorable Richard Stone United States Senate Washington, D. C.
20510
Dear Senator Stone:
I am pleased to respond to your letter of August 14, 1979 (File #9222170003) which enclosed correspondence from Kathy Griffin regarding the Crystal River Unit 3 tiuclear Power Plant.
I have enclosed our August 13, 1979 letter to Kathy Griffin which was written in response to her June 12, 1979 letter to Secretary James Schlesinger.
Kathy Griffin's letter to you is essentially identical to her letter to Secretary Schlesinger, which I have also enclosed.
I trust the information in the enclosures is reponsive to your request.
Sincerely, OP!G!rML stGNED BY R.G. SMITH Lee V. Gossick Executig ouedcr
Enclosures:
for Operations 1.
8/13/79 f4RC ltr. to K. Griffin 2.
6/12/79 ltr. frm.
K. Griffin to Sec. J. Schlesinger 3.
8/14/79 ltr. fm.
1550 033 Sen. D. Stone to NRC l'#
014
't 7012130 LL