ML19210E676
| ML19210E676 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 11/23/1979 |
| From: | Parker W DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19210E677 | List: |
| References | |
| NUDOCS 7912050518 | |
| Download: ML19210E676 (1) | |
Text
.a l ) tili l; l 'ow l: N llo stI % N Y n,m - n n,.s,
.vn sv,ncu,,ao
~,,:,a<
n.u,o1 N
t' x..:
.-.i..
4 c c:,b e r 21, 1979
't.
J.
P. O'Reilly, Director
'egion II office of Inspectiuti and Enforcement l'
S.
?!uclear Regulatory Coaaission
,uttc 3100 101 M.irietta Street Atlanta, Georgia 30303 Re:
RII:BRL SG-369/79-R
- A.
'tr. O'Reilly i' ewe: Comp.inv d o.n not n
>ide
,m intor:ation contaira d in i'- i-
.'.pecttan Report 50-369/79-F tt.
bt i ropr iet.t ry.
- ru l;
'ou r. *
{
~-
-'./ -g
/*
(_ 'g s.(
,[
4 (fI 6
'i O.
P.1 r n t J 1 (. _,
1502 238 D9P D D 'TX' b
o A. 2.
l-s),
,U'
?
k
, g L,nk.u a
u o
.~r P
' %, r, f, j
.l
/11 H l;Vt'I' Ji V
'{ '
~
7912 050 f /8
/
'o UNITED STATES g
NUCLEAR REGULATORY COMMISSION n
E REGION li a #
o 101 MARIETTA ST., N.W., SUITE 3100 Y
ATLANTA, GEORGIA 30303 g*****
o NOV g 1g79 In Reply Refer To:
RII:BRC 50-369/79-38 Duke Power Company Attn: ' W. O. Parker, Jr.
Vice President, Steam Production Post Office Box 2178 Charlot te, North Carolina 28242 Gentlemen:
This refers to the inspection conducted by B. R. Crowley of this office an October 22-23, 1979 of activities authorized by NRC Construction Permit No.
CPPR-83 for the McGuire Nuclear Station facility, and to the discussion of our findings held with G. W. Grier at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the enclosed inspection report.
Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
1502 239 7 912 0 50 f c} E
Duke Power Company NOV - 51979 Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, C. E. Murphy, Clilief Reactor Construction and Engineering Support Branch
Enclosure:
Inspection Report No. 50-369/79-38 cc w/ enclosure:
M. D. McIntosh, Plant Manager Post Office Box 488 Cornelius, North Carolina 28031 J. C. Rogers, Project Manager Post Office Box 33189 Charlotte, North Carolina 28242 1502 240