Forwards IE Insp Repts 50-518/79-23,50-519/79-23, 50-520/79-23 & 50-521/79-23 on 790925-28.No Noncompliance Noted
ML19210E578
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 10/25/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19210E579 List:
References
NUDOCS 7912050323
Download: ML19210E578 (2)


See also: IR 05000518/1979023

Text

9

s

An pro

[b

[

'o

UNITED STATES

8

~g

c-

g

NUCLEAR REGULATORY COMMISSION

n

'g

g

~r

REGION il

o,,

101 MARIETTA ST

N.W.. SUITE 3100

NO

'*

%*****o

ATLANTA, G EORGI A 30303

gf

OCT 2 51979

In Reply Refer To:

RII:JB

50-518/79-23

$0-519/79-23

50-520/79-23

50-521/79-23

Tennessee Valley Authority

'

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by J. J. Blake of this office on

September 25-28, 1979, of activities authorized by NRC Construction Permit

Nos. CPPR-150, CPPR-151, CPPR-152 and CPPR-153 for the Hartsville facility, and

to the discussion of our findings held with R. T. Hathcote at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspction consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncomplicuce were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

~

a

C. E. Murphy, Chie

Reactor Construction and Engineering

Support Branch

1502

198

7912050 3 2 3

.

.

Tennessee Valley Authority

-2-

OCT 2 51979

Enclosure:

Inspection Report Nos. 50-518/79-23,

50-519/79-23, 50-520/79-23, 50-521/79-23

cc w/ encl:

R. T. Hathcote, Project Manager

P. O. Box 2000

Hartsville, TN 37074

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, Tennessee

37902

J. E. Wills, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

E. G. Beasley

Tennessee Valley Authority

309 Grant's Building

Knoxville, Tennessee 37902

1502

199