ML19210E496
| ML19210E496 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 09/24/1979 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML19210E491 | List: |
| References | |
| NUDOCS 7912050107 | |
| Download: ML19210E496 (2) | |
See also: IR 05000277/1979014
Text
.
,
Sn nao
UNITED STATES
o
NUCLEAR REGULATORY CoMMisslON
[
R EGION I
o
$
k
$31 PARK AVENUE
f
KING OF PRUS$lA PENNSYLVANIA 19404
<g,
o
SEP 2 41979
Docket Nos. 50-277
50-278
Philadelphia Electric Company
ATTN: Mr. S. L. Daltroff
Vice President
Electric Production
,
2301 Market Street
Philadelphia, Pennsylvania 19101
<
Gentlemen:
Subject:
Inspection 50-277/79-14; 50-278/79-16
This refers to the inspection conducted by Mr. J. Serabian of thie office on
June 22,1979 of activities authorized by NRC License Nos. DPR-44 and DFR-56 and
to the discussions of our findings held by Mr. Serabian with Mr. W. Knapp of
your staff at the conclusion of tne inspection, and to a subsequent telephone
discussion between Mr. Ullrich and Mr. Crocker of our office on July 20, 1979.
Within this area, the inspection consisted of selective examinations of
records, interviews with personnel, measurements made by the inspector and
observations made by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
This item of
noncompliance has been categorized into the levels as described in our
correspondence to you dated December 31, 1974.
This notice is sent to you
pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you
to submit to this office, within twenty (_20) days of your receipt of this
notice, a written statement or explanation in reply including:
(1) corrective
steps which have been taken by you and the results achieved; (2) corrective
steps which will be taken to avoid further items of noncompliance; and (3)
the date when full compliance will be achieved.
1498 o\\1
2 9mo60
5/d P
s
.
Philadelphia Electric Company
2
The item shown in the Notice of Vitlation enclosed with this letter, ir s
recurrent item.
In your response please give this matter your particular
attention.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosures
will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractcr) believe to be proprietary, it
is necessary that you make a written application within 20 days to this
office to withhold such information from public disclosure.
Any such
application must be accompanied by an affidavit executed by the owner of
the information, which identifies the document or part sought to be withheld,
and which contains a statement of reasons which addresses with specificity
the items which will be considered by the Comission as listed in subparagraph
(b)(4) of hetion 2.730.
The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear from you in this regard within the specified period, the
report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
Or
L
OIL
Geo eH Safith, Chief
Fue Fa ility and Materials Safety
Br nch
Enclosures:
1. Appendix A, Notice of Violation
2. Office of Inspection and Enforcement Inspection
Report Numbers 50-277/79-14; 50-278/79-16
cc w/ encl:
W. T. Ullrich, Station Superintendent
Troy B. Conner, Jr., Esquire (Without Report)
Eugene J. Bradley, Esquire (Without Report)
Raymond L. Hovis, Esquire (Without Report)
Michael J. Scibinico, II, Assistant Attorney General (Without Report)
1498
018