Text
Nd
ne
/
UNITED STATES
g -fv//
o
!
g
NUCLEAR REGULATORY COMMISSION
- g
o
'
g
ae
REGION II
'#
o
101 MARIETTA ST
N.W., SUITE 3100
o
ATLANTA, GEORGIA 30303
00T 2 51979
In Reply Refer To:
RII:EJV
50-416/79-25
50-417/79-25
.
Mississippi Power and Light Company
Attn:
N. I. Stampley
Vice President of Production
Post Office Box 1640
Jackson, Mississippi 39205
Gentlemen:
This refers to the inspection conducted by E. J. Vallish of this office on
October 3-5, 1979 of activities authorized by NRC Construction Permit Nos.
CPPR-118 and CPPR-119 for the Grand Gulf Nuclear Station facility, and to the
discussion of our findings held with J. C. Fuller at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Fec'eral Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Ig91
302
7 912050 Dh
t
-2-
OCT 2 51973
,
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
P
C. E. Murphys Thi
Reactor Construction and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-416/79-25
and 50-417/79-25
cc w/ enclosures:
C. K. McCoy
Plant Manager
Post Office Box 756
Port Gibson, Mississippi 39150
1561
303