ML19210E447
| ML19210E447 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/27/1979 |
| From: | Reid R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML19210E442 | List: |
| References | |
| NUDOCS 7912050053 | |
| Download: ML19210E447 (2) | |
Text
.
7590-01 ' ZINN.'~
~
" - ~
y.m.
~
UNITED STATES NUCLEAR REGULATORY COMMISSION f,, f
-- :; 9.sp gp.i D0r.KET NO. 50-302 NWMW-FLORIDA POWER CORPORATION
"[N.$f CITY OF ALACHUA CITY OF BUSHNELL CITY OF GAINESVILLE CITY OF KISSIMMEE CITY OF LEESBURG CITY OF NEW S11YRNA BEACH AND UTILITIES COMMISSION, CITY OF NEW SMYRNA BEACH CITY OF OCALA ORLANDO UTILITIES COMMISSION AND CITY OF ORLANDO SEBRING UTILITIES COMMISSION SEMIN0LE ELECTRIC COOPERATIVE, INC.
C TY OF TALLAHASSEE NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY
]
OPERATING LICENSE I
The U. S. Nuclear Regulatory Comission (the Comission) has issued Amendment No. 26 to Facility Operating License No. DPR-72,
.~
issued to the Florida Power Corporation (FPC), City of 21achua, City of Bushnell, City of Gainesville, City of Kissimee, City of Leesburg, City of New Sntyrna Beach and Utilities Comission, City of New Sntyrna Beach, City of Ocala, Orlando Utilities Comission and City of Orlando, Sebring Utilities Comission, Seminole Electric Cooperative, Inc., and the City of Tallahassee (the licensees) which revised the Technical Specifications for operation of the Crystal River Unit No.
3 Nuclear Generating Plant (the facility) located in Citrus County, Florida.
The amendment becomes effective 90 days after issuance te provide time to train adriitional fire bricat neMers.
This amendment modifies the Technical Snacifir atinns to reouire a five man fire brigade. The evaluation relating to this change is contaliied 1.3# 273 Hi' 7912 0 500 $
7590-01 in the Comission's document entitled " Evaluation of Minimum Fire Brigade Shift Size" dated June 8,1979, which was transmitted to FPC by letter from the I'
Comission dat2d August 28,1979.
The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules r
and regulations. The Comission has made appropriate findings as required by the t
Act and the Comission's rules and, regulations in 10 CF2 Chapter I, which are set forth in the license amendment.. Prior public notice of this amendment was not required since the amendment do'es not involve a significant hazards 4:onsideration:
The Comission has determined that the issuance of this amendment will not' result in any significant environmental impact and that pursuant to 10 CFR ES1.S(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.
For further deta.ils with respect to this action, see (1) the application for amendment dated October 1,1979,(2) Amendment No. 26 to License No. DPR-72, and (3) the Comission's letters to FPC dated August 28, 1979, and November 27, 1979 All of these items are available for public inspection at the Comission's Public document Room,1717 H Street, NW, Washington, D. C., and at the Crystal River Public Library, Crystal River, Florida.
A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Comission, Washington, D. C.
20555, Attention: Director, Division of Operating Reactors.
Dated at Bethesda, Maryland, this 27th day of November 1979.
FOR THE NUCLEAR REGULATORY COMMISSION O.
.g&, }. Y '?ll-
% 4r Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors 1 Hf 274 a