ML19210E430

From kanterella
Jump to navigation Jump to search
Notification of 791121 Meeting W/Util & Bechtel to Discuss IE Bulletin 79-02 Anchor Bolt Insp Program at Facility
ML19210E430
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/20/1979
From: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
791020, NUDOCS 7912050027
Download: ML19210E430 (3)


Text

_

,,a nec

[

o UNITED STATES g

NUCLEAR REGULATORY COMMISSION o

h WASHINCTON, D. C. 20555 o

%..... +'

SSINS #6820 NOV 2 01979 Docket No. 50-255 MEMORANDUM FOR: Norman C. Moseley, Director Division of Reactor Operations Inspection, IE

'FROM:

E. L. Jordan, Assistant Director for Technical Programs, Division of Reactor Operations Inspection, IE

SUBJECT:

FORTHCOMING MEETING WITH CONSUMERS POWER COMPANY TO DISCUSS IE BULLETIN 79-02 ANCHOR BOLT INSPECTION PROGRAM AT PALISADES Date and Time:

Wednesday, November 21, 1979 9:00 a.m.

Location:

Maryland National Bank Building Room 6507

Purpose:

To discuss the anchor bolt inspection program at Palisades (see attached Agenda).

Participants:

NRC Consumers Power Co.

E. Jordan K. Osborne H. Wong R. Jenkins I. Yin D. Hoffman J. Fair H. Ashar Bechtel R. Silver F. Rinaldi J. Dotson R. Stephens T. Johnson J. Ruff S. Kapour r

ordan, Assistant Director fo echnical Programs Division of Reactor Operations Inspection

Enclosure:

Agenda cc: See attached sheet 1500 231 CONTACT:

H. J. Wong, TP 49-28180 N

~

MEETING NOTICE DISTRIBUTION Docket 1NRC PDR Local PDR H. Denton E. Case D. Eisenhut R. Yollmer D. Crutchfield D. Ziemann B. Grimes

  1. V. Noonan J. Knight R. Bosnak F. Schauer G. Reinnuth ELD SD Receptionist - MNBB NRC Participants J. R. Buchanan TERA ACRS (16)

D. Bunch O

.231

MEETING AGENDA CONSUMERS POWER COMPANY MEETING ON NOVEMBER 21, 1979 ON IE BULLETIN 79-02 ANCHOR BOLT INSPECTION PROGRAM AT PALISADES I.

Status of Previous Random Sampling Program II. Palisades' Anchor Bolt Testing Program III. Technical Review of Shell Expansion Measurements for Shell Type Anchor Bolts (Shoulder to Cone Measurement)

Industry Review IV.

NRC Experience Feedback V.

Plans for Startup from Outage VI. Base plate Flexibility Analysis and Calculations VII.

Progress Review and Schedule 1500 233 g rnn q77 7 J VU 4a 7$1,$

f g

d