Forwards IE Insp Rept 50-341/79-21 on 791004-05.No Noncompliance Noted
ML19210E420
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/18/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML19210E421 List:
References
NUDOCS 7912050016
Download: ML19210E420 (2)


See also: IR 05000341/1979021

Text

0%

[f "80

9

UNITED STATES

0

,

'

NUCLEAR REGULATORY COMMISSION

f

T {gj

REGloN ill

f

799 NOOSEVELT ROAD

GLEN ELLYN ILLINOIS 60137

.....

OCT 1 B 19I3

Docket No. 50-341

s

The Detroit Edison Company

ATTN: Me r.dward Hines, Assistant

Vice President and Manager

Quality Assurance

2100 Second Avenue

Detroit, MI 48226

Gent.lemen:

This refers to the inspection conducted by Mr. C. M. Erb of this office

on October 4-5, 1979, of activities at Enrico Fermi Nuclear Power Station,

Unit 2, authorized by NRC Construction Permit No. CPPR-87 and to the

-

discussion of our firAings with Mr. Everett, Mr. Walker and others at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures end representative records,

observations, and intervicws with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an enclosure

to the application.

1500

208

.

.

t9120500 M

.

.

.

The Detroit Edison Company

-2-

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

,

%

%W4

Caston Fiorelli, C ief

Reactor Construction and

Engineering Support Branch

Enclosure: IE Inspection

Report No. 50-341/79-21

cc w/ encl:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Ronald Callen, Michigan Public

Service Commission

Eugene B. Thomas, Jr.,

Attorney

.

1500 209