ML19210E420
| ML19210E420 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/18/1979 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| Shared Package | |
| ML19210E421 | List: |
| References | |
| NUDOCS 7912050016 | |
| Download: ML19210E420 (2) | |
See also: IR 05000341/1979021
Text
0%
[f "80
9
UNITED STATES
0
,
'
NUCLEAR REGULATORY COMMISSION
f
T {gj
REGloN ill
f
799 NOOSEVELT ROAD
GLEN ELLYN ILLINOIS 60137
.....
OCT 1 B 19I3
Docket No. 50-341
s
The Detroit Edison Company
ATTN: Me r.dward Hines, Assistant
Vice President and Manager
Quality Assurance
2100 Second Avenue
Detroit, MI 48226
Gent.lemen:
This refers to the inspection conducted by Mr. C. M. Erb of this office
on October 4-5, 1979, of activities at Enrico Fermi Nuclear Power Station,
Unit 2, authorized by NRC Construction Permit No. CPPR-87 and to the
-
discussion of our firAings with Mr. Everett, Mr. Walker and others at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted of
a selective examination of procedures end representative records,
observations, and intervicws with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you
or your contractors believe to be proprietary, you must apply in writing
to this office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure. The application must
include a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary
information identified in the application is contained in an enclosure
to the application.
1500
208
.
.
t9120500 M
.
.
.
The Detroit Edison Company
-2-
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
,
%
%W4
Caston Fiorelli, C ief
Reactor Construction and
Engineering Support Branch
Enclosure: IE Inspection
Report No. 50-341/79-21
cc w/ encl:
Central Files
Reproduction Unit NRC 20b
Local PDR
Ronald Callen, Michigan Public
Service Commission
Eugene B. Thomas, Jr.,
Attorney
.
1500 209