Text
7 644 UNITED STATES
+
[ ] )",g(f/,g NUCLEAR REGULATORY COMMISSION C
WASHINGTON, D. C. 20555
%, v,/
NOV 2 a 1g3
+....
DOCKET NOS. 50-369 AND 50-370 APPLICANT: DUKE POWER COMPANY FACILITY:
MCGUIRE NUCLEAR STATION, UNITS 1 & 2
SUBJECT:
SUMMARY
OF MEETING HELD ON OCTOBER 30, 1979 A meeting was held with the applicant on October 30, 1979 in Bethesda, Maryland to discuss the modified constant axial offset control (CAOC) procedure. A summary of the meeting is enclosed.
a
[L J A N,/l A 't 7
Ralph A. Birkel Light Wates :leactors Branch No. 2 Division of Project Management
Enclosure:
Meeting Sumary dated November 13, 1979 ces w/ enclosure:
See next pages 1437 218 7911300 M 9
Mr. William 0. Parker, Jr.
2olgpg Vice President, Steam Production Duke Powr Company P. O. Box 2178 422 South Church Street Charlotte, North Carolina 28242 cc: Mr. W. L. Porter Duke Power Company P. O. Box 2178 422 South Church Street Charlotte, North Carolina 28242 Mr. R. S. Howa rd Pomr Systems Division Westinghouse Electric Corporation P. O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. E. J. Keith EDS Nuclear Incorporated-220 Montgomery Street San Francisco, California 94104 Mr. J. E. Houghtaling NUS Corporation 2536 Countryside Boulevard.
Clearwater, Florida 33515 Mr. Jesse L. Riley, President The Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 J. Michael itGarry, III, Esq.
Debevoise & Liberman 1200 Seventeenth Street, N. W.
Washington, D. C.
20036 Robert M. Lazo, Esq., Chairman Atomic Safety and Licensing Board U. S. Nuclear Regulatory Conmission Washington, D. C.
20555 Dr. Emmeth A. Luebke Atomic Safety and Licensing Board U. S. Nuclear Regulatory Conmission Washington, D. C.
20555 Dr. Cadet H. Hand, Jr., Director Bodega Marine Lab of California P. O. Box 247 Bodega Bay, California 94923 i
1437 219 h
Mr. William 0. Parker, Jr.
NOVe 09:3g cc: Anthony Z. Roisman, Esq.
Natural Resources Defense Council
- 917'- 15th Street, N. W.
Washington, D.
C.'
'20555 Richard P. Wilson, Esq.
Assistant Attorney General State of South Carolina 2600 Bull Street Columbia, South Carolina 29201 I
,, c:, k kshgg<\\pq;;,
i.\\ -
a
\\ '.
7911300Z 3 0 1437 220
ENCLOSURE pn neoog'o, UNITED STATES 8
' 7.
NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 NOV I.9;g79 MEMORANDUM FOR:
K. Kniel, Chief, Core Performance Branch, DSS FROM:
M. Dunenfeld, Core Performance Branch, DSS
SUBJECT:
SUMMARY
OF DUKE POWER, WESTINGHOUSE, BNL AND NRC MEETING - OCTOBER 30, 1979 A meeting was held on October 30, 1979 in Bethesda between the subject participants to discuss modified load follow strategy-constant axial offset control (CAOC) procedures proposed for the McGuire Nuclear Station. A list of meeting attendees is enclosed. The purpose was to have Westinghouse present the details of the new CAOC procedures. This was needed because a proposed response to our question on this matter was inadequate, and we judged the presentation would expedite our being able to reach agreement with the applicant on what is needed to complete our review.
(Task 13 on the McGuire review schedule).
2 Upon hearing the presentation it was clear to us that we needed a sub-stantial report on the subject in order to perform our review. Westinghouse agreed to provide the required material in the form of a letter report from Nestinghouse to K. Kniel, hopefully in 1979, but no later than the end of January 1980. This would consist of the slides and verbal part of the presentation, the latter yet having to be written up.
In addition it would include exposition of all the load follow cases analyzed (not just the usual subset), a discussion of the controls used to vary the reactor temperature, and, dependent upon further discussion with J. Rosenthal and M. Dunenfeld, results of three dimensional calculations to show separability of x-y and z aspects of the calculational model.
Pending timely receipt of the letter report and the satisfactory nature of its contents, we agreed that no new questions on this matter would be asked on the McGuire docket. Duke Power will reference the letter report to satisfy the outstanding question on McGuire.
Mit M. Dunenfeld Reactor Physics Section Core Performance Branch Division of Systems Safety 9
1437 221 0
NRC - DUKE W MEETING 10/30/1979 Meeting Attendees M. Dunenfeld NRC-CPB R. Wade Miller W-NFD Les Bencint W-NFD C. R. Tuley h[ Nuclear Safety H. C. Ratsep
}[ Nuclear Safety P. M. Abraham Duke Power R. S. Howard h[ Projects J. E. Rosenthal NRC-DOR-RSB L. K. Casagrande
![ NTD-Systems Analysis Daniel Fieno NRC-CPB Michael Todosow BNL' Walter L. Brooks NRC-CPB Howard Richings NRC-CPB Robert Schemel NRC-CPB l437 222
.