Forwards IE Insp Rept 50-348/79-30 on 790910-14.No Noncompliance Noted
ML19210E170
Person / Time
Site: Farley 
Issue date: 10/18/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML19210E171 List:
References
NUDOCS 7911300650
Download: ML19210E170 (2)


See also: IR 05000348/1979030

Text

  1. p"'*%'o

T/G

UNITED STATES

E

8

~g

) *,

g

NUCLEAR REGULATORY COMMISSION

g$f2

,r

REGION 11

g....[.g#

'

o,

101 MARIETTA ST

N.W.. SUITE 3100

8

ATLANTA, GEORGIA 30303

In Reply Refer To:

OCT 181079

RII:CMH

50-348/79-30

Alabama Power Company

ATTN:

F. L. Clayton, Jr.

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by C. M.

Hosey of this office on

September 10-14, 1979, of activities authorized by NRC License Nos. NPF-2 for

the Farley facility, and to the discussion of our findings held with W. G.

Hairston, III at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have exarr.ined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Docurent Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasonr, on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

1437

209

7911300

OCT 181979

,

Alabama Power Company

-2-

,

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

4

%'dtc

J. T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

Enclosure:

Inspection Report No. 50-348/79-30

cc w/ encl:

A. R. Barton

Executive Vice President

P. O. Box 2641

Birmingham, AL 35291

J. T. Young

Vice President-Production

Post Office Box 2614

Birmingham, Alabama 35291

H. O. Thrash

Manager-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

C. Biddinger, Jr.

Manager-Corporate Quality Assurance

P. O. Box 2641

Birmingham, AL 35291

W. G. Hairston, III

Plant Manager

Drawer 470

Ashford, AL 36312

R. E. Hollands, Jr.

QA Supervisor

P. O. Box U

Ashford, AL 36312