- p"'*%'o
T/G
UNITED STATES
E
8
~g
) *,
g
NUCLEAR REGULATORY COMMISSION
g$f2
,r
REGION 11
g....[.g#
'
o,
101 MARIETTA ST
N.W.. SUITE 3100
8
ATLANTA, GEORGIA 30303
In Reply Refer To:
OCT 181079
RII:CMH
50-348/79-30
Alabama Power Company
ATTN:
F. L. Clayton, Jr.
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by C. M.
Hosey of this office on
September 10-14, 1979, of activities authorized by NRC License Nos. NPF-2 for
the Farley facility, and to the discussion of our findings held with W. G.
Hairston, III at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have exarr.ined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Docurent Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasonr, on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
1437
209
7911300
OCT 181979
,
Alabama Power Company
-2-
,
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
4
%'dtc
J. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosure:
Inspection Report No. 50-348/79-30
cc w/ encl:
A. R. Barton
Executive Vice President
P. O. Box 2641
Birmingham, AL 35291
J. T. Young
Vice President-Production
Post Office Box 2614
Birmingham, Alabama 35291
H. O. Thrash
Manager-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
C. Biddinger, Jr.
Manager-Corporate Quality Assurance
P. O. Box 2641
Birmingham, AL 35291
W. G. Hairston, III
Plant Manager
Drawer 470
Ashford, AL 36312
R. E. Hollands, Jr.
QA Supervisor
P. O. Box U
Ashford, AL 36312