ML19210D987
| ML19210D987 | |
| Person / Time | |
|---|---|
| Site: | Hartsville |
| Issue date: | 10/19/1979 |
| From: | Sutherland J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris J TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19210D988 | List: |
| References | |
| NUDOCS 7911290136 | |
| Download: ML19210D987 (2) | |
See also: IR 05000518/1979020
Text
[b
+ym
Wssn
-
- o
UNITED STATES
8
1
NUCLEAR REGULATORY COMMISSION
N
$
E
REGION 11
o
101 MAnlETTA sT., N.W., sulTE 3100
[D/
ATLANTA, GEORGIA 30303
In Reply Refer To:
RII:ALC
OCT 191979
50-518/79-20
50-519/79-20
50-520/79-20
50-521/79-20
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by A. L. Cunningham of this office on
September 4-6, 1979 of activities authorized by NRC Construction Permit Nos.
.
CPPR-150, CPPR-151, CPPR-152 and CPPR-153 for the Hartsville Nuclear facility,
and to the discussion of our findings held with R. T. Hathcote at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective e:.aminations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is
discussed in the enclosed report.
Two new unresolved items rer.lted from this inspection and are discussed in the
enclosed report.
These items will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's "Rulen, of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
insy ction report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, as/ should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
1434
242
/%
7911290
4
'
OCT ] 91973
Tennessee Valley Authority
-2-
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
1
g J. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosure:
Inspection Report Nos. 50-518/79-20,
50-519/79-20, 50-520/79-20
and 50-521/79-20
cc w/ enc 1:
R. T. Hathcote, Project Manager
P. O. Box 2000
Hartsville, TN 37074
J. F. Cox
400 Commerce Street
W10C131 C
Knoxville, Tennessee
37902
J. E. Wills, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
1434
243