VIRGINIA EI.ECTRIC AND PowEn COMPANY Hrcuuonn,Vrmorx tA eness November 8, 1979
[
C gu Mr. James P. O'Reilly, Director Serial No.
670A Office of Inspection and Enforcement P0/RMT:baw U. S. Nuclear Regulatory Commission Docket No.
50.-338 Region II Licence No.
NPF-4 N
101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Subject:
Dear Mr. O'Reilly:
In our letter of September 27, 1979, in response to IE Bulletin 79-19,
" Packaging of Low Level Radioactive Waste for Transport and Burial",
we notified you that we would provide a response for Item No. 9 on or about October 31, 1979.
Our response to that Item for North Anna Power Station Unit No. 1 is attached.
Very truly yours,
- 27. ???. Jina,;,9>
C. M. Stallings Vice President-Power Supply and Production Operations Attachment cc: Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Director, Division of Fuel Facility and Materials Safety Inspection U. S. Nuclear Regulatory Commission Washington, D. C.
20555
)I0\\
\\
nn2so30A 9 qqgq5/n n a.,n ca
Attachment, page 1 NORTH ANNA PO'JER STATION SUPPLEMENTAL RESPONSE TO IE EULLETIN 79-19 NRC ITEM 9.
Report, in writing, within 45 days, your plan cf action and schedule with regard to the above items.
RESPONSE
Time schedule for the Implementation of Applicable Items Item 1.
The latest revision of DOT Regulations as contained in Title 49 has been received and is now on file at the station.
Item 3.
The administrative procedure for the designation of personnel responsible for the safe transfer, packaging and transfer of low-level radioactive materials has been written and is presently awaiting safety committee approval.
Item 5.
The Operations and Health Physics development programs are in the process of being expanded to incorporate the additional training required by IE Bulletin 79-19.
Changes recently proposed for acceptable shipment and burial will require review and development of training material.
Both the training programs will be conpleted and implemented on or about July 1,1980.
T601 356
.