|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20149F8321994-09-0707 September 1994 Responds to to D Rathbun,Requesting That NRC Look Into Matter of Licensing of Nuclear Fuel Reprocessing Plant at Barnwell,Sc ML20149F8331994-08-18018 August 1994 Forwards Info Received from Constituent WR Ripley Re Difficulty W/Info Concerning Nuclear Fuel Reprocessing Plant at Barnwell,Sc,For Response ML20096F0981992-05-12012 May 1992 Ack Receipt of Re NRC Pending Decision of Barnwell Nuclear Fuel Plant,Barnwell,Sc.Licensee Does Not Intend to Provide Addl Info in Support of Request for Continuation of Construction Permit CPCSF-4 ML20082B9251991-07-11011 July 1991 Forwards Corrections & Clarifications of Several Factual Matters in Commission Paper SECY-91-021 Re Const License for Barnwell Nuclear Fuel Plant,Per Allied-General Nuclear Svcs Exam of Documents Transmitted by NRC ML20070P9001991-03-21021 March 1991 Responds to 910228 Request for Addl Info Re Consequences of Extending CP CPCFS-4.Vendor Does Not Intend to Pursue Const Activities at Present Time.Possible Sale/Transfer of Facility to DOE or Govt Contractors Discussed ML20029B1781991-02-28028 February 1991 Requests Addl Info Re 900711 Request to Extend Const Permit for Separations Facility of Barnwell Nuclear Fuel Plant. Info Needed Re Intended Const Activites If Date Extended & long-range Plans.Requests Info Be Submitted by 910401 ML20055G5181990-07-19019 July 1990 Forwards Ltr from Allied-General Nuclear Svcs Re CP CPCSF-4 ML20055G5831990-07-11011 July 1990 Requests Further Extension Until 930930 or Earlier as Result of Various Uncertainties Existing Re Nuclear Waste Program Including Govt Plans in Area of Savannah River Plant ML20147F5551987-11-16016 November 1987 Expresses Disappointment W/Nrc Decision to Adopt Rule Change Re Licensing of Nuclear Power Plant W/O Participation of State & Local Govts in Emergency Evacuation Planning. Served on 871201 ML20237L3851987-08-25025 August 1987 Forwards from Allied-General Nuclear Svcs Re Status of CP for Plant Separations Facility ML20237L4141987-08-20020 August 1987 Requests That Further Extension Be Granted to 900930 for Completion of Const ML20236B0461987-07-21021 July 1987 Forwards Affidavit of LC Rouse Re Plant CP & Regulations for Issuance of Ol,Per Request.Content of Affidavit Based on Mod of Recipient 870716 Draft ML20215L2441987-03-25025 March 1987 Informs That AF Ritardi Replaced Cl Tuch as Official Contact on Matters Re CPCSF-4.AF Ritardi Address Listed ML20235F1741987-01-21021 January 1987 Submits New Mailing Address for All Correspondence Re Facility Due to Author Retirement ML20209E3511986-08-0505 August 1986 Forwards Notice of Name Change of Partners in Valley Pines Assoc Re Separations Facility at Barnwell Nuclear Fuel Plant ML20097G2571984-08-20020 August 1984 Forwards Allied-General Nuclear Svcs Re Status of CP for Separations Facility of Barnwell Nuclear Fuel Plant ML20097G2761984-08-15015 August 1984 Requests Extension Until 870930 for Const Completion. Extension Requested Based on Chem Nuclear Desire to Purchase Strip of Property ML20090H8341984-04-0202 April 1984 Forwards Remaining Info Required for Amend of State Matls License,For Possession Only ML20084R6871984-03-30030 March 1984 Advises That Effective 840330 Author,Will Be Retiring from Allied General Nuclear Svcs.After 840330,correspondence Should Be Addressed to C Nielsen,Vice President,Allied Chemical Nuclear Products,Inc ML20088A4771984-01-26026 January 1984 Forwards Consultant Final Rept:Barnwell Nuclear Fuel Plant Decommissioning Project & Rept of Radiological Overview Survey for Barnwell Nuclear Fuel Plant Decommissioning Project. Matls Inventory Also Encl ML20083H0221983-12-14014 December 1983 Responds to IE Bulletin 83-07 & 83-07,Suppl 1, Apparently Fraudulent Products Sold by Ray Miller,Inc. No Subj Matl Installed in safety-related Sys at Facility ML20083H1411983-12-13013 December 1983 Forwards Application to Amend State of Sc Radioactive Matls License 144 & to DOE Summarizing Current Status of Shutdown Activities ML20083G7291983-12-13013 December 1983 Responds to IE Bulletin 83-07 & 83-07 Suppl 1, Apparently Fraudulent Products Sold by Ray Miller,Inc. No Subj Matl Installed at Facility.Matl in Stock Identified,Isolated & Tagged B10639, Forwards Addl Reporting Criteria for Unplanned Liquid Radioactive Releases.New Criteria Cover Specific Types of Potential Liquid Releases Not Presently Covered.Response Requested by 8304031983-01-21021 January 1983 Forwards Addl Reporting Criteria for Unplanned Liquid Radioactive Releases.New Criteria Cover Specific Types of Potential Liquid Releases Not Presently Covered.Response Requested by 830403 ML20028C6411982-12-0303 December 1982 Informs That Partnership Name of Ga Co Changed to Valley Pine Associates.Certified Copy of Filing & Affidavit Encl ML20070A9601982-11-17017 November 1982 Ack Receipt of IE Insp Rept 50-332/82-03.No Proprietary Info ML20027A9461982-08-30030 August 1982 Ack Receipt of IE Insp Rept 50-332/82-02.No Proprietary Info ML20065C2301982-08-16016 August 1982 Requests Extension of Const Completion Date Until 830930 ML20062A7901982-06-0101 June 1982 Expresses Appreciation for Hospitality Extended During Mar & Apr Site Visits to Review Safeguards Sys ML20039C8401981-11-23023 November 1981 Requests Extension Until 820930 of Completion Date for Facility.No Action Was Taken by Commission on 781109 Request for Extension to 811231 ML19353A3401980-12-10010 December 1980 Ack Receipt of IE Insp Rept 50-332/80-03 on 801015-17.No Proprietary Info ML20002C2521980-11-18018 November 1980 Forwards IE Insp Rept 50-332/80-03 on 801015-17.No Noncompliance Noted ML19347B5691980-10-10010 October 1980 Submits Comments on Resumption of Gesmo Rulemaking on Behalf of Az Public Svc Co,Cp&L,Con Ed & Wi Electric Power Co. Proceeding Would Provide Factual Basis on Which NRC Could Render Independent Judgment on Urgently Needed Issues ML19347C1491980-10-0808 October 1980 Supports Resumption of Gesmo Proceeding as Prelude to Closure of Nuclear Fuel Cycle ML19338F8671980-10-0808 October 1980 Responds to Transmitting J Courtney Request for NRC Resumption of Gesmo Proceedings.J Courtney Comments Will Be Incorporated Into Public Record to Be Considered by NRC ML19347B8871980-09-30030 September 1980 Forwards Suppl 2 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required ML19338E6241980-09-30030 September 1980 Responds to Commission 800807 Order Requesting Comments on Reopening of Gesmo & Other recycle-related Licensing Proceedings.Proceedings Should Be Reactivated & Consistent Position on Use of Energy Initiated ML19295A6331980-09-29029 September 1980 Comments on Rulemaking 50-5:GESMO Proceeding Should Be Rescheduled ML19295A6351980-09-29029 September 1980 Forwards Comments on Behalf of NRDC on Rulemaking 50-5:GESMO Proceedings Should Not Be Reopened ML19337B2671980-09-29029 September 1980 Forwards Comments on Reopening of Gesmo Proceedings Re Rulemaking 50-5:reinstitution of Hearing Reflects Us Interest in Energy Need & Will Establish Framework for Timely Decisions on Reprocessing & Recycling ML19337B2691980-09-26026 September 1980 Comments on Reopening of Gesmo Proceedings Re Rulemaking 50-5:no Further Action Needed Due to Completion of Evidence ML19338E9941980-09-26026 September 1980 Comments on Rulemaking 50-5 Re Reopening of Gesmo & Recycle Related Proceedings.Reopening Record Will Resolve Economic, Environ & Resource Questions Re Fuel Reprocessing ML19338E6321980-09-26026 September 1980 Recommends Reopening of Gesmo Proceedings ML19337B2681980-09-25025 September 1980 Comments on Reopening of Gesmo Proceedings Re Rulemaking 50-5:continuation of Review Process Needed to Determine Whether Reprocessing & Recycling Is Viable Option ML19337B3191980-09-25025 September 1980 Comments on Reopening of Gesmo Proceedings Re Rulemaking 50-5:hearing Must Be Reopened Promptly Due to Need for Establishing Legal & Logical Basis for Evaluation of Spent Fuel Reprocessing ML19295A6411980-09-23023 September 1980 Recommends Resumption of Gesmo Proceedings.Persian Gulf Area Warfare Necessitates Technical Development of Spent Reactor Fuels to Lessen Dependence on Imported Oil ML19337B2721980-09-23023 September 1980 Comments on Reopening of Gesmo Proceedings Re Rulemaking 50-5:reopening & Successful Completion of Hearing Is Logical Precedent to Commercial Reprocessing of Spent Nuclear Fuel ML19336A3731980-09-17017 September 1980 Comments on Rulemaking 50-5:GESMO Proceedings Should Be Reopened.Draft Article Encl Which Should Have Some Input in Forming Policy on Recycling Pu ML19338D2671980-09-15015 September 1980 Comments on Rulemaking 50-5:GESMO Proceedings Should Be Reopened.Technical,Economic & Safety Issues Must Be Addressed in Order for Decisions to Be Made Re Use of mixed- Oxide Fuels ML20040C5131980-09-15015 September 1980 Reiterates 790201 Request That Environmetalist,Inc Be Informed of All Matters Re Barnwell Nuclear Fuel Plant & Barnwell Nuclear Fuel Receiving & Storage Station 1994-09-07
[Table view] Category:NRC TO VENDOR/MANUFACTURER
MONTHYEARML20062A7901982-06-0101 June 1982 Expresses Appreciation for Hospitality Extended During Mar & Apr Site Visits to Review Safeguards Sys ML20002C2521980-11-18018 November 1980 Forwards IE Insp Rept 50-332/80-03 on 801015-17.No Noncompliance Noted ML19347B8871980-09-30030 September 1980 Forwards Suppl 2 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required ML19344B4341980-08-29029 August 1980 Forwards IE Info Notice 80-32, Clarification of Certain Requirements of Exclusive Use Shipments of Radioactive Matls ML19338D5281980-08-21021 August 1980 Forwards IE Circular 80-20, Changes in Safe-Slab Tank Dimensions. No Written Response Required ML19331D2331980-08-14014 August 1980 Forwards IE Info Notice 80-24, Low Level Radwaste Burial Criteria. No Written Response Required.Jh Sniezek 800530 Memo Encl ML19338C8941980-07-28028 July 1980 Forwards IE Insp Rept 50-332/80-02 on 800708-11.No Noncompliance Noted ML19330A3241980-06-24024 June 1980 Forwards IE Circular 80-14, Radioactive Contamination of Plant Demineralized Water Sys & Resultant Internal Contamination of Personnel. No Written Response Required ML19326D6101980-06-18018 June 1980 Forwards IE Bulletin 80-15, Possible Loss of Emergency Notification Sys (ENS) W/Loss of Offsite Power. Written Response Required ML19323F5631980-05-0606 May 1980 Forwards IE Info Notice 80-19, NIOSH Recall of Recirculating-Mode (Closed Circuit) Self-Contained Breathing Apparatus (Rebreather). No Response Required ML19316B0391980-05-0505 May 1980 Forwards IE Info Notice 80-18, Possible Weapons Smuggling Pouch. No Specific Action or Response Required ML19323F3811980-05-0202 May 1980 Forwards 800328 Fr Excerpt Re Proposed Amends to NRC Regulations Specifying Criteria for Determining Whether Amends to OLs or CPs Involve Significant Hazards Consideration.Comment Period Expires 800527 ML19305C0161980-03-14014 March 1980 Forwards IE Info Notice 80-11, Generic Problems W/Asco Valves in Nuclear Applications Including Fire Protection Sys. No Action or Written Response Required ML19210D5101979-11-0909 November 1979 Forwards IE Info Notice 79-12A, Attempted Damage to New Fuel Assemblies. No Action Required ML19254B1161979-09-0707 September 1979 Forwards IE Info Notice 79-20,Revision 1, NRC Enforcement Policy - NRC Licensed Individuals. Notice Reissued to Correct Word Omission & Punctuation Error Which Changed Intent of Statement.Changed Statement Underlined in Text ML19249B4281979-08-14014 August 1979 Forwards IE Info Notice 79-20, NRC Enforcement Policy - NRC Licensed Individuals. No Action Required ML19225B2981979-07-0606 July 1979 Forwards IE Info Notice 79-18, Skylab Reentry. No Action Required ML19276E0831979-02-23023 February 1979 Forwards IE Circular 79-03, Inadequate Guard Training/ Qualification & Falsified Training Records ML19263C5491979-02-0202 February 1979 Forwards IE Info Notice 79-02, Attempted Extortion - Low Enriched U ML19270F0141978-12-14014 December 1978 Forwards IE Insp Rept 50-332/78-06 on 781128-1201.No Noncompliance Noted ML19274C7111978-10-0202 October 1978 Forwards IE Inspec Rept 50-332/78-05 on 780906-07 During Which No Items of Noncompliance Were Noted 1982-06-01
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20149F8321994-09-0707 September 1994 Responds to to D Rathbun,Requesting That NRC Look Into Matter of Licensing of Nuclear Fuel Reprocessing Plant at Barnwell,Sc ML20029B1781991-02-28028 February 1991 Requests Addl Info Re 900711 Request to Extend Const Permit for Separations Facility of Barnwell Nuclear Fuel Plant. Info Needed Re Intended Const Activites If Date Extended & long-range Plans.Requests Info Be Submitted by 910401 ML20236B0461987-07-21021 July 1987 Forwards Affidavit of LC Rouse Re Plant CP & Regulations for Issuance of Ol,Per Request.Content of Affidavit Based on Mod of Recipient 870716 Draft ML20062A7901982-06-0101 June 1982 Expresses Appreciation for Hospitality Extended During Mar & Apr Site Visits to Review Safeguards Sys ML20002C2521980-11-18018 November 1980 Forwards IE Insp Rept 50-332/80-03 on 801015-17.No Noncompliance Noted ML19338F8671980-10-0808 October 1980 Responds to Transmitting J Courtney Request for NRC Resumption of Gesmo Proceedings.J Courtney Comments Will Be Incorporated Into Public Record to Be Considered by NRC ML19347B8871980-09-30030 September 1980 Forwards Suppl 2 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required ML19344B4341980-08-29029 August 1980 Forwards IE Info Notice 80-32, Clarification of Certain Requirements of Exclusive Use Shipments of Radioactive Matls ML19338D5281980-08-21021 August 1980 Forwards IE Circular 80-20, Changes in Safe-Slab Tank Dimensions. No Written Response Required ML19331D2331980-08-14014 August 1980 Forwards IE Info Notice 80-24, Low Level Radwaste Burial Criteria. No Written Response Required.Jh Sniezek 800530 Memo Encl ML19338C8941980-07-28028 July 1980 Forwards IE Insp Rept 50-332/80-02 on 800708-11.No Noncompliance Noted ML19330A3241980-06-24024 June 1980 Forwards IE Circular 80-14, Radioactive Contamination of Plant Demineralized Water Sys & Resultant Internal Contamination of Personnel. No Written Response Required ML19326D6101980-06-18018 June 1980 Forwards IE Bulletin 80-15, Possible Loss of Emergency Notification Sys (ENS) W/Loss of Offsite Power. Written Response Required ML19323F5631980-05-0606 May 1980 Forwards IE Info Notice 80-19, NIOSH Recall of Recirculating-Mode (Closed Circuit) Self-Contained Breathing Apparatus (Rebreather). No Response Required ML19316B0391980-05-0505 May 1980 Forwards IE Info Notice 80-18, Possible Weapons Smuggling Pouch. No Specific Action or Response Required ML19323F3811980-05-0202 May 1980 Forwards 800328 Fr Excerpt Re Proposed Amends to NRC Regulations Specifying Criteria for Determining Whether Amends to OLs or CPs Involve Significant Hazards Consideration.Comment Period Expires 800527 ML19305C0161980-03-14014 March 1980 Forwards IE Info Notice 80-11, Generic Problems W/Asco Valves in Nuclear Applications Including Fire Protection Sys. No Action or Written Response Required ML19210D5101979-11-0909 November 1979 Forwards IE Info Notice 79-12A, Attempted Damage to New Fuel Assemblies. No Action Required ML19254B1161979-09-0707 September 1979 Forwards IE Info Notice 79-20,Revision 1, NRC Enforcement Policy - NRC Licensed Individuals. Notice Reissued to Correct Word Omission & Punctuation Error Which Changed Intent of Statement.Changed Statement Underlined in Text ML19249B4281979-08-14014 August 1979 Forwards IE Info Notice 79-20, NRC Enforcement Policy - NRC Licensed Individuals. No Action Required ML19225B2981979-07-0606 July 1979 Forwards IE Info Notice 79-18, Skylab Reentry. No Action Required ML19261D1161979-04-16016 April 1979 Responds to Describing Unsuccessful Efforts of Group to Be Included in Facility Tour.Tour Was Not Part of NRC Review in Proceedings ML19276E0831979-02-23023 February 1979 Forwards IE Circular 79-03, Inadequate Guard Training/ Qualification & Falsified Training Records ML19263C5491979-02-0202 February 1979 Forwards IE Info Notice 79-02, Attempted Extortion - Low Enriched U ML19270F0141978-12-14014 December 1978 Forwards IE Insp Rept 50-332/78-06 on 781128-1201.No Noncompliance Noted ML19274C7111978-10-0202 October 1978 Forwards IE Inspec Rept 50-332/78-05 on 780906-07 During Which No Items of Noncompliance Were Noted ML20210A8121974-05-0909 May 1974 Forwards List of Licensed Facilities for Processing & Reprocessing Pu & Pending Applications Per 740328 Request. List of Sites W/Plans for Similar Facilities & Licensees Authorized to Possess Pu for Specified Purposes Also Encl 1994-09-07
[Table view] |
Text
/
'o,'
UNITED STAT S 8
NUCLEAR REGULATORY COMMISSION n
g
-r REGION 11 I
101 MARIETTA ST N.W., SUITE 3100 e*
ATLANTA, GEORGIA 30303 In Reply Refer To:
NOV 9 1979 RII:JP0 50-332 Allied-General Nuclear Services Attn:
Mr. Raymond C. Baxter President P. O. Box 847 Barnwell, South Carolina 29812 Gentlemen:
This Information Notice is provided to inform licensees of a possible signifi-cant matter.
It is expected that recipients will consider dissemination of the information to all persons working at their licensed facilities.
No specific action or response is requested at this time.
If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions.
If you have any questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.
Sincerely,
' %%'g>0.q,
~ -.w %.%.
James P. O'Reilly Director
Enclosures:
1.
IE Information Notice No.79-12A 2.
List of IE Information Notices Issur.d in Last 6 Months i
5 sj4 29n270 &
{
SSINS No.:
6300 UNITED STATES Accession No.:
NUCLEAR REGULATORY COMMISSION 7910250490 0FFICE OF INSPECTION AND ENFORCEMLNT WASHINGTON, D.C.
20555
'N D
YD November 9, 1979 "9 "9 43 e0 6
IE Information Notice No.79-12A ATTEMPTED DAMAGE TO NEW FUEL ASSEMBLIES This notice provides supplemental information concerning the identification and conviction of the persons responsible for the introduction of a possibly damaging substance to the new fuel stored at the Virginia Electric and Power Company's Surry Power Station in Surry County, Virginia.
Investigation of this incident by the FBI culminated in the surrender of William E.
Kuykendall and James A. Merrill, Jr., both VEPC0 employees at that time, to Surry County authorities on June 19, 1979.
A Grand jury hearing was held in Surry, Virginia on July 24, 1979.
The certified charges of breaking and entering with intent to damage electrical facilities (felony), and willful destruction of utility company equipment (felony) were returned on a true bill for trial. An earlier charge for willful damage (mis-demeanor) which had not been certified to the grand jury was reapplied, certified and returned on a true bill for trial. Two additional charges against both men were introduced for conspiracy regarding the two felonies and returned on e. true bill for a total of four felonies and one misdemeanor against each man.
Trial commenced on October 10, 1979 in the Circuit Court, Surry County, Virginia.
The presiding judge ruled that the prosecution failed to supply sufficient evidence to support the charges of conspiracy, breaking and entering, and damage to pro-perty as a misdemeanor. The primary reason for dropping the charges was that the subjects had been authorized unescorted access to Vital Areas by VEPCO.
On October 17, 1979, the jury returned a verdict of guilty (both Kuykendall and Merrill) for violation of Virginia Code 18.2-162 (Intentional damage to a facility which furnishes electric service to the public) and set punishment as two (2) years in the State Penitentiary for both subjects, the minimum sentence provided by law.
This Information Notice is provided to inform licensees of a possibly significant matter.
It is expected that recipients wi'.1 consider dissemination of the information to all persons working at thei. licensed facilities.
If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.
No written response to this Information Notice is required.
I395 535
IE Information Notice No.79-12A Enclosure November 9, 1979 Page 1 of 2 LISTING OF IE INFORMATION NOTICES ISSUED IN LAST SIX MONTHS Information Subject Date Issued To Notice No.
Issued 79-26 Breach of Containment 11/5/79 All power reactor Integrity facilities holding OLs and cps 79-25 Reactor Trips at Turkey 10/1/79 All power reactor Point Units 3 and 4 facilities holding OLs and cps 79-24 Overpressurization of 10/1/79 All power reactor Containment of a PWR facilities holding Plant After a Main Steam OLs and cps Line Break 79-23 Emergency Diesel Generator 9/26/79 All Holders of cps Lube Oil Coolers and OLs 79-22 Qualification of Control 3/17/79 All Holders of cps Systems 9/14/79 All Holders of OLs 79-21 Transportation and Commer-9/11/79 All Licensees as Supple-cial Burial of Radioactive mental Information to Materials IE Bulletin Nos. 79-19
& 79-20 79-20 NRC Enforcement Policy 9/7/79 All Holders of Reactor (Rev. 1)
NRC Licensed Individuals OLs and cps and Production Licensees with Licensed Operators 79-20 NRC Enforcement Policy 8/14/79 All Holders of Reactor NRC Licensed Individuals OLs and cps and Production Licensees with Licenred Operators 79-19 Pipe Cracks in Stagnant 7/18/79 All Holders of Reactor (Correction - Borated Water Systems at OLs and cps Enclosure)
PWR Plants 79-19 Pipe Cracks In Stagnant 7/17/79 All Holders of Reactor Borated Water Systems At OLs and L?s PWR Platts 79-18 Skylab Reentry 7/6/79 All Helders of Reactor OLs i395
<36
IE Information Notice No.79-12A Enclosure Ncvember 9, 1979 Page 2 of 2 LISTING OF INFORMATION NOTICES ISSUED IN LAST SIX MONTHS Information Subject Date Issued To Notice No.
Issued 79-17 Source Holder Assembly Damage 6/20/79 All Holders of Reactor Damage From Misfit Between OLs and cps Assembly and Reactor Upper Grid Plate
'79-16 Nuclear Incident at Three 6/22/79 All Research Reactors Mile Island and Test Reactors with OLs 79-15 Deficient Procedures 6/7/79 All Holders of Reactor OLs and cps 79-14 NRC Position of Electrical 6/11/79 All Power Reactor Cable Support Systems Facilities with a CP 79-12A Attempted Damage to New 11/9/79 All Fijel Facilities, Fuel Assemblies Research Reactors, and OLs and cps 31.5 jj/
,