ML19210D392
| ML19210D392 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 10/23/1979 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19210D391 | List: |
| References | |
| 10130, NUDOCS 7911270019 | |
| Download: ML19210D392 (1) | |
Text
-_
TEXAS UTILITIES GENERATING COMPANY 2001 HHYAN TOWEH + DALLAS. TEXAS 75201
- a. ;. om October 23, 1979 "fM;'Jt';;"L';-
TXX-3058 Mr. W. C. Seidle, Chief Reactor Construction and Engineering Support Branch U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 1000 Docket Nos. 50-445/Rpt. 79-18 Arlington, Texas 76012 50-446/Rpt. 79-18 COMANCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION NOTICE OF VIOLATION DATED SEPTEMBER 24, 1979 DOCKET NOS. 50-445 & 50-446 FILE NO. 10130
Dear Mr. Seidle:
Your Notice of Violation dated September 24, 1979 required a response by October 25, 1979.
We are in the process of performing an extensive evaluation of the entire QA/QC effort at the CPSES site and will incorporate the results of the completed evaluation into our response.
We plan to submit our report not later than November 30, 1979.
Very truly yours, R[J. Gary RJG:df b
b 348 yo112oO \\f