Text

b

.

h

n neog'o

a

UNITED STATES

do-S&7

8

g

NUCLEAR REGULATORY COMMISSION

JMJ

o

$

E

REGION 11

i

0

101 MARIETTA ST

N.W.. SUITE 3100

o

ATLANTA, GEORGIA 30303

OCT 121979

In Reply Refer To:

RII:HJG

52-327/79-51

50-328/79-27

Tenressee Valley' Authority

ATTH:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by M. J.

Gouge of this office on

September 18-20, 1979, of activities authorized by NRC Construction Permit Nos.

CPPR-72 and CPPR-73 for the Sequoyah Nuclear Plant facility, and to the discussion

of our findings held with J. E. Wilkens at the conclusion of the inspection.

.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

~

personnel, and observations by the inspector.

Within the scope of this irspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

1491

320

1

A

7911260

.

Tennessee Valley Authority

-2-

OCT 121979

.

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

-

Sincerely,

'

C. E.

urphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 52-327/79-51

and_50-328/79-27

cc w/ encl:

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

J. M. Ballentine

Plant Superintendent

P. O. Box 2000

Daisy, TN 37319

J. F. Cox

400 Commerce Street

W10C131 C

Knoxville, TN 37902

D. L. Lambert, Project Engineer

) 32l

400 Chestnut Street Tower II

Chattanooga, TN 37401