e0 **%g 73 s #g UNITED STATES o
S ((> g (';
NUCLEAR REGULATORY COMMISSION
- J
/.. E REGION 1 0, ' id
[
631 PARK AVENUE
%, ' ~ u d
,o KING OF PRUSSIA, PENNSYLVANIA 19406
+.***
Docket Nos. 50-322 50-516 50-517 NOV 0 81973 Long Island Lighting Company ATTN:
Mr. Andrew W. Wofford Vice President 175 East Old Country Road Hicksville, New York 11801 Gentlemen:
Enclosed is IE Bulletin No. 79-02, Revision 2, which requires action by you with regard to your power reactor facility (ies) with an operating license or a construction permit.
Should you have questions regarding this Bulletin or the actions required of you, please contact this office.
Sincerely, m
_ K Boyce. Grier
~ Director
Enclosures:
1.
IE Bulletin No. 79-02, Revision 2 2.
List of IE Bulletins Issued in the Last Six Months CONTACT:
L. E. Tripp (215-337-5282) cc w/encls:
J. P. Novarro, Project Manager Edward M. Barrett, Esquire Edward J. Walsh, Esquire T. F. Gerecke, Manager, Engineering QA Depcrtment 1392 543 791128 o O
UNITED STATES SSINS No.:
6820 NUCLEAR REGULATORY COMMISSION Accession No.:
OFFICE OF INSPECTION AND ENFORCEMENT 7908220136 WASHINGTON, D.C.
20555 IE Bulletin No. 79-02 (Revision 2)
Date:
November 8, 1979 Page 1 of 8 PIPE SUPPORT BASE PLATE DESIGNS USING C0FCRETI EXPANSION ANCHOR LOLTS Description of Circumstances:
Inspection experiences and the review of licensee response have identified several R2 areas where the Bulletin intent has not been adequately addressed by licensees.
R2 Revision No. 2 of the Bulletin is intended to clarify the intent of the Bulletin R2 and establish the NRC positions on minimum factors of safety, anchor bolt preload, R2 and the expected date of completion for certain Bulletin actions.
R2 Since the issuance of IE Bulletin No. 79-02 on larch 8, 1979, IE inspection R1 experience and many inquiries from licensees indicate that additional informa-R1 tion and clarification is needed.
This revision is intended to serve that R1 purpose.
None of the requirements of the original Bulletin have been deleted, R1 and the due date for completion of the requested actions (July 6, 1979) has R1 not been changed.
The following text supersedes the text of Bulletin No. 79-02.
R1 Changes from the original text are identified by R1, R2 in the margin, The purpose R1 of this revision is to identify acceptable ways of satisfying the Bulletin R1 requirements.
R1 While performing inservice inspections during a March-April 1978 refueling outage at Millstone Unit 1, structural failures of piping supports for safety equipment were observed by the licensee.
Subsequent licensee inspections of undamaged supports showed a large percentage of the concrete anchor bolts were not tightened properly.
Deficiency reports, in accordance with 10 CFR 50.55(e), filed by Long Island Lighting Company on Shoreham Unit 1, indicate that design of base plates using rigid plate assumptions has resulted in underestimation of loads on some anchor bolts.
Initial investigation indicated that nearly fifty percent of the base plates could not be assumed to behave as rigid plates.
In addition, licensee inspection of anchor bolt installations at Shoreham has shown over fifty percent of the bolt installations to be deficient.
Vendor Inspection Audits by NRC at Architect Engineering firms have shown a wide range of design practices and installation procedures which have been employed for the use of concrete expansion an
~
are toward more rigorous controls an bolts.
DUPLICATE DOCUMENT The data available on dynamic testin I39d )44 e
fatigua failures can occur at loads Entire document previously entered 1 to system un r:
ANO R1 and R2 - Identifies those additio r =
q N o.
of pages:
d