| Site: | Crystal River |
| Issue date: | 10/29/1979 |
| From: | Beatty G FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 7911200466 | |
| Download: ML19210D042 (1) | |
Text
'l f__y t O C I 2 '
r
. o r ^ i 3a
.o 2 : O f TELECOPY October 29, 1979 Mr. J. P. O'Reilly, Director USNRC Region II Office of Inspection & Enforcement 101 Marietta St., Suite 3100 hae 0 g
3 o
Atlanta, C-A 30303 Jee o
RE:
Decket 50-302 License DPR-72 This will confirm a report to Mr. D. R. Ouick of your effice at 1412 on 26 October 1979.
It was discovered at pipe stress of a 3 x 2 reducer on the SW system outlet 1412 on 26 October 1979 that the of RCP-1A ceter thrust bearing cooler exceeds the FSAR required allcwable stress.
Automatic isolation valves are available this line from the SR system.
to isolate the affected section of An engineering evaluation of this event tion to this problem.
is being conducted to provide a solu-A detailed report of this event will follow within fourteen (l') days.
ve vim u tiy P'.
Beatty, Jr.
Nuclear Plant Manager Crystal.tiver Unit #3 Florida P7wer Corporation l & P. 01tEtu?